My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-03_REVISION - M2012023
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012023
>
2024-01-03_REVISION - M2012023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 8:04:38 AM
Creation date
1/3/2024 8:09:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012023
IBM Index Class Name
Revision
Doc Date
1/3/2024
Doc Name
Notice of Surety Increase
From
Brent Tamburelli - Tamrock Gravel LLC
To
DRMS
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization <br /> Site: Shot Rock Pit Permit Action: 2023 Inspection Permit/Job#: M2012023 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 12/5/2023 County: Las Animas Filename: M023-005 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $20.26 $36.04 $47.05 <br /> Operating Cost/Hour: $39.51 $76.08 $82.85 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $82.29 $158.17 $175.95 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> CatD8T-8 S U 53.08 $255.49 $175.95 1 $431.44 $175.95 $250.00 <br /> Drill/Broadcast 25.00 $6.73 $82.29 2 $178.04 $164.58 $500.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: 1 $609.48 $340.53 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,3/4 T. $15.83 1 $15.83 $15.83 <br /> Subtotals: $15.83 $15.83 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: TRINIDAD <br /> Total one-way travel distance: 12.50 miles <br /> Average Travel Speed: 45.00 mph <br />
The URL can be used to link to this page
Your browser does not support the video tag.