Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation Cost Summary for the Lopez Quarry No.2 <br /> Site: Lopez Quarry No.2 Permit Action: 2023 Inspection Permit/Job#: M2007034 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/7/2023 County: Las Animas Filename: M034-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Cut slopes to 3:1 DOZER 1 0.51 $227 <br /> 002 Apply 6 inches of topsoil over 6 acres DOZER 1 17.74 $7,839 <br /> 003 Apply 2 inches of topsoil over 1.5 acres DOZER 1 1.42 $627 <br /> 004 Re-vegetate 7.5 acres REVEGE 1 7.50 $12,828 <br /> 005 Mobilization and demobilization of equipment MOBILIZE 1 4.24 $4,878 <br /> SUBTOTALS: 31.41 $26,399 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $533 <br /> Performance bond: 1.05 Total= $277 <br /> Job superintendent: 15.71 Total= $1,022 <br /> Profit: 10.00 Total= $2,640 <br /> TOTAL O&P= $4,472 <br /> CONTRACT AMOUNT(direct+O&P)= $30,871 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,312 <br /> Reclamation management and/or administration: 5.00 $1,544 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $7,828 <br /> TOTAL BOND AMOUNT(direct+indirect)= $34,227 <br />