Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 11 of 11 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: TRINIDAD <br /> Total one-way travel distance: 20.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $4,807.18 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $70.90 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.40 0.40 <br /> Return Time(Hours): 0.40 0.40 <br /> Loading Time(Hours): 0.66 NA <br /> Unloading Time(Hours): 0.66 NA <br /> Subtotals: 2.12 0.80 <br /> JOB TIME AND COST <br /> Total job time: 4.24 Hours <br /> Totaljob cost: 54,878 <br /> CIRCES Cost Estimating Software <br />