Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#003 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 530.00 0.00 2.00 2.00 3005 0.639 <br /> Haul Time: 0.639 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 530.00 0.00 2.00 2.00 3005 0.322 <br /> Return Time: 0.322 minutes <br /> Total Truck Cycle Time: 4.028 minutes <br /> Loading Tool unit <br /> Production 733.33 LCY/Hour Adjusted for job efficiency: 608.67 LCY/Hour <br /> Truck Unit Production <br /> 368.70 LCY/Hour Adjusted for job efficiency: 306.02 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 612.04 LCY/Hour <br /> Adjusted single truck/loader team production: 608.67 LCY/Hour <br /> Adjusted multiple truck/loader team production: 608.67 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 19.34 Hours <br /> Unit cost: $2.276 /LCY Total job cost: $26,785 <br /> CIRCES Cost Estimating Software <br />