My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-12_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2023-12-12_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:09:35 PM
Creation date
12/12/2023 3:06:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
12/12/2023
Doc Name Note
Pikeview Blasting
Doc Name
Request for Technical Revision
From
Riverbend Industries, Inc.
To
DRMS
Type & Sequence
TR23
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Elements of a Blasting Plan <br /> I. Blast Schedule Notification: <br /> a. Name, address & phone number of Operator; <br /> • Castle Aggregates a Riverbend Industries company <br /> • 7250 Allegheny Drive <br /> Colorado Springs Colorado 80919 <br /> b. Identify where blasting will occur; <br /> • All blasting will be inside of the affected area of the Pikeview <br /> Recalmation Project M1977-210-04 <br /> • Address 7250 Allegheny Drive Colorado Springs CO <br /> • Area A Upper west portion of the Pikeview Quarry <br /> • Area B Lower north Portion of the Pikeview Quarry known as <br /> a the Dragon's Back <br /> c. Day(s) and time(s) of blasting; <br /> • Day of the blast will be determined <br /> • Time of day will be after 7.00 am and prior to 4.00 pm <br /> d. Methods used to control access; <br /> • All site operations will be halted 30 minutes prior to blast <br /> sequence <br /> • Nonessential personnel will be sent offsite <br /> • The existing quarry gate will be closed and locked during <br /> blasting <br /> • Any onsite personnel will be gathered at the scale house until <br /> blasting is complete <br /> • 980 Loader will be parked across Pikeview Quarry road during <br /> the shutdown <br /> e. Outline warning signals (e.g., sirens, horns, etc.); <br /> • Three horn Blasts will be sounded 10 seconds prior to blast <br /> detonation <br /> f. Schedule distribution (who is notified: e.g., workers, <br /> residents, local governments, etc.). <br /> • Onsite <br /> • Stantec Engineering Tim Culbertson, Michaela Swain <br /> • Dwire Earthmoving LLC Dean Bazek <br /> • Castle Aggregate Jerald Schnabel <br /> • Offsite <br /> • Air Force Academy Control Tower <br /> • Oak Valley Homeowners Association <br /> CAUsersltc1\Documents\TechnicaRB last ing\Key Elements of a Blasting Plan.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.