Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />December 11, 2023 <br /> <br /> <br />Kevin Peart <br />Holcim - WCR, Inc. <br />1687 Cole Blvd., Suite 300 <br />Golden, CO 80401 <br /> <br /> <br />Re: Daniels Sand Pit 2 - File No. M-1973-007-SG <br /> Holcim - WCR, Inc. <br /> Technical Revision (TR-10) <br /> Import Material Notice <br /> <br />Dear Kevin Peart: <br /> <br />On December 11, 2023 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on December 7, 2023, addressing the <br />following: <br /> <br />Imported fill material is required with volume estimates of approximately ~30,000 tons. <br />Approximate timeframe of importing the fill will be December 2023 to December 2024. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 10 approved by the Division are hereby incorporated into <br />Permit No. M-1973-007-SG. All other conditions and requirements of Permit No. M-1973-007-SG <br />remain in full force and effect. <br /> <br /> <br />Bond Held: $1,038,500.00 <br />Prior Liability: $1,038,500.00 <br />Change in Liability: $0.00 <br />Revised Liability: $1,038,500.00 <br />Prior Permit Acreage: 286.12 <br />Change in Permit Acreage: 0.00 <br />Revised Permit Acreage: 286.12 <br />Prior Affected Acreage: 286.12 <br />Change in Affected Acreage: 0.00 <br />Revised Affected Acreage: 286.12 <br />