My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-07_REVISION - M2002020 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002020
>
2023-12-07_REVISION - M2002020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:20:13 AM
Creation date
12/7/2023 9:40:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002020
IBM Index Class Name
Revision
Doc Date
12/7/2023
Doc Name
Adequacy Review Response
From
City of Greeley
To
DRMS
Type & Sequence
TR3
Email Name
HR1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> 0' 1 5' 30' 60' 1. THIS MAP DOES NOT REPRESENT A BOUNDARY SURVEY OR TITLE SEARCH PERFORMED BY BOULDER LAND CONSULTANTS,INC OR THE UNDERSIGNED. THERE PROJECT CONTROL POINT TABLE <br /> MAY EXIST EASEMENTS AND/OR OTHER ENCUMBRANCES AFFECTING THE SUBJECT PROPERTY THAT ARE NOT SHOWN HEREON. POINT# NORTHING EASTI N G ELEVATION DESCRIPTION <br /> 2. LOCATION FOR THE INFORMATION SHOWN HEREON IS BASED ON MODIFIED STATE PLANE COORDINATES,COLORADO NORTH ZONE 501. ALL DIMENSIONS ARE IN 1001 1407342.467 3213975.611 4671.45 BLCSP <br /> 1 INCH=60 FEET(11 X 1 INCH=30 FEET(22 X 4)34) U.S.SURVEY FEET(AT GRID). DIMENSIONS SHOWN HEREON ARE IN U.S.SURVEY FEET. <br /> 44 3. SITE BENCHMARKS ARE CONTROL POINT"1000","1001",1002","1003","1004"AND"1005".PROJECT BENCHMARK FOR VERTICAL INFORMATION SHOWN HEREON IS 1002 1407287.717 3214104.565 4671.69 BLCSP <br /> "Q 136",AN NGS BENCH MARK DISK LOCATED ON THE WEST SIDE OF COUNTY ROAD 23 AND NORTH OF EASTMAN PARK DRIVE ON THE SOUTH SIDE OF RAILROAD 1003 1407242.534 3214378.74 4673.022 BLCSP <br /> THIS MAP WAS PREPARED BY TRACKS,NAVD 88 ELEVATION:4767.82'. CONTOUR INTERVAL IS 1 FOOT. <br /> 1004 1407289.451 3214517.04 4672.16 BLCSP <br /> BOULDER LAND 4. NO UNDERGROUND UTILITIES WERE DELINEATED OR SURVEYED FOR THIS PROJECT. <br /> CONSULTANTS,INC. 1005 1407355.184 3214655.375 4671.58 BLCSP <br /> 5. DATE OF FIELDWORK:NOVEMBER 2021,NOVEMBER 2022 <br /> 1w 1006 1407388.625 3214737.277 4671.24 BLCSP <br /> 6. TREES OF 12"AND GREATER HAVE BEEN LOCATED. <br /> 950 LARAMIE BLVD, UNIT D 7• FEMA INFORMATION:THE SELECT TOPOGRAPHIC AREAS ARE LOCATED IN TWO ZONES ACCORDING TO THE FEMA FLOOD INSURANCE RATE MAP,COMMUNITY <br /> BOULDER, CO 80304 (303) 443-3616 PANEL NO.08123C1528E,DATED JANUARY 20,2016.FLOOD INFORMATION IS SUBJECT TO CHANGE AND IS APPROXIMATED HEREON. <br /> -.BLCs-yoc:.com ZONE AE BASE FLOOD ELEVATIONS DETERMINED <br /> ZONE AE(FLOODWAY)THE FLOODWAY IS THE CHANNEL OF A STREAM PLUS ANY ADJACENT <br /> FLOODPLAIN AREAS THAT MUST BE KEPT FREE OF ENCROACHMENT SO THAT THE 1 <br /> CHANCE FLOOD CAN BE CARRIED WITHOUT SUBSTANTIAL INCREASES IN FLOOD HEIGHTS. <br /> NOTE: 8. CERTIFICATION DEFINED: THE USE OF THE WORDS"CERTIFY"OR"CERTIFICATION"BY A REGISTERED PROFESSIONAL LAND SURVEYOR CONSTITUTES AN <br /> THIS MAP DOES NOT REPRESENT EXPRESSION OF PROFESSIONAL OPINION REGARDING THE FACTS AND FINDINGS WHICH ARE THE SUBJECT OF THE CERTIFICATION,AND DOES NOT CONSTITUTE A <br /> A BOUNDARY SURVEY OR TITLE WARRANTY OR GUARANTY,EITHER EXPRESSED OR IMPLIED. THE CERTIFICATION SHOWN HEREON EXTENDS ONLY TO THOSE PARTIES SPECIFICALLY MENTIONED <br /> SEARCH PERFORMED BY BOULDER THEREIN(PER COLORADO STATE BOARD RULE 1.6(B)(2). <br /> LAND CONSULTANTS, INC. THERE <br /> MAY EXIST EASEMENTS AND/OR 9, IN ACCORDANCE WITH C.R.S.13-80-105: <br /> OTHER ENCUMBRANCES AFFECTING NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU <br /> THE SUBJECT PROPERTY THAT ARE NOT SHOWN HEREON. FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE <br /> OF THE CERTIFICATION SHOWN HEREON. co <br /> N <br /> O <br /> 04 <br /> 0 <br /> 04 <br /> N <br /> E <br /> O <br /> z <br /> z <br /> //O ® 0 <br /> � O 0 <br /> 1006 <br /> a z <br /> 1\'F IL <br /> ELE• ELEV.:4671.24 <br /> BLCSP <br /> N-1407388.62 <br /> E-3214737.28 <br /> 005 <br /> SP 4671.58 <br /> BLC <br /> 1001\ N=1407355.18 <br /> BLCSP4� � E=3214655.38 <br /> N-140]342.4] o <br /> E-3213975.61 <br /> Q <br /> 1004 <br /> � <br /> BL LI�F'ys <br /> 662� <br /> �' ELEV.:4671.69 CSP, 0 BLCSP <br /> N-140728].72 467216 ......... <br /> N <br /> N=,40]289.45 rO :r�\A'` Rp•• <br /> E-3214104.56 E=321451].04 r • /��•O <br /> c-> 4388 z: <br /> o03 •• <br /> ELEV.:4673.02 ••• : .�i <br /> t BLCSP • <br /> ++ N-1407242.53 .......... <br /> o E-321437B.74 <br /> NAI.E�G <br /> Print Date: Nov 29. 2023 Sheet Revisions POUDRE PONDS BANK STABILIZATION PROJECT Project No./Code <br /> File Name: Survey Control 20119B.dwg Date: Comments Init. Otak �� A No Revisions: SURVEY CONTROL 20119E <br /> O Cigof V <br /> GreelColorado <br /> � Revised: Designer: CR Structure <br /> a � Detailer: KM Numbers <br /> Void: Sheet Subset: Subset Sheets: Sheet Number G4 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.