My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-07_REVISION - M2002020 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002020
>
2023-12-07_REVISION - M2002020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:20:13 AM
Creation date
12/7/2023 9:40:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002020
IBM Index Class Name
Revision
Doc Date
12/7/2023
Doc Name
Adequacy Review Response
From
City of Greeley
To
DRMS
Type & Sequence
TR3
Email Name
HR1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br /> AlpineEco AlpineEco <br /> Poudre Ponds Bank Stabilization Project b. Carbon to nitrogen ratio:20:1 or lower <br /> Revegetation Plan c. Soluble salt concentration:5.0 dS/m(mmhos/cm)or less <br /> November 29,2023 <br /> d. Organic matter content:30 to 70 percent <br /> General Notes: 12. All areas to revegetated will also receive 750 pounds per acre of Biosol Forte 7-2-1, <br /> 1. This Revegetation Plan was prepared by Andy Herb,AlpineEco. which will be surface applied after compost is applied and tilled. <br /> 2. Any trees to be removed for the project will be removed during the non-nesting season 13. Areas of temporary disturbance for equipment access will be restored to original <br /> for migratory birds(between September 1 and March 31).If this is not possible,active contours,amended,seeded,and either mulched(if less than 3H:1V slope)or blanketed <br /> nest surveys will be required. according to the following,specifications. <br /> 3. Unnecessary impacts will be avoided by fencing the limits of construction.There will be Planting and Seeding Notes: <br /> no vehicle access outside the limits of construction. <br /> 14. A qualified ecologist will direct and supervise all plant harvest and installation.The <br /> 4. To avoid the continued spread of noxious weeds,all discrete populations of Colorado exact installation locations for live plant material will be based on the final grading,as <br /> List A or B noxious weeds found in or within 100 feet of the restoration area will be determined by a qualified ecologist. <br /> sprayed with the appropriate herbicide(s)prior to construction.Russian Olive(Elaeagnus M <br /> 15. Live cuttings will be collected on-site or from elsewhere in Weld County or nearby N <br /> angustifolia)and Saltcedar(Tamarisk spp.)must be removed using the"cut-stump' g �'( Y N <br /> method(see Specifications).Weed populations must be identified by a qualified counties)within 500 vertical feet of near the site.A qualified ecologist must approve <br /> ecologist during the growing season. collection site(s). N <br /> 5. All best management practices(BMPs)shall be selected,installed,implemented,and 16. Live cuttings to be installed on the Lower and Upper Planting Benches(Table 1)will be a) <br /> maintained according to appropriate engineering,hydrologic,and pollution control harvested when dormant(before leaves emerge or after they are dropped)from live E <br /> practices.All erosion control materials will be biodegradable and not use plastic netting. plants 0.5 to 1.0 inch in diameter.The stem will be stripped of all branches before cutting o <br /> and then trimmed to the desired length.The lower(rooting)end of the stem will be cut Z <br /> 6. No chemicals shall be used,stored,or stockpiled within 50 horizontal feet of the river or at a 45-degree angle and the upper end will be cut at a 90-degree angle.The lower end of <br /> other aquatic habitats. the cuttings will be placed into cold water(<50 degrees F)within one minute of cutting Z <br /> 7. All waste materials generated by the construction(garbage,excess soil or rock,etc.)will and then transferred to a storage vessel within 1 hour where they will remain 0 <br /> be stockpiled and disposed of in an approved upland location. completely submerged for at least 72 hours,but not more than 14 days,prior to planting. W <br /> 8. The project must meet the revegetation performance standards outlined in the The water will be kept cold during the entire soaking period.During planting,the 0 <br /> specifications before the contractor is released from maintenance responsibilities. cuttings will be kept wet until placed into the ground and will not be allowed out of Q <br /> water for more than 10 minutes. Z <br /> Earthwork Notes: � <br /> 17. Cuttings will be installed to a depth of two-thirds their length(20 inches for the Lower <br /> 9. If topsoil will be imported,a qualified ecologist will inspect the donor site for Planting Bench and 40 inches for the Upper Planting Bench),being sure to have the <br /> undesirable species,noxious weeds,and other indicators of poor soil quality prior to rooting end(45-degree angle cut)at the bottom.After installing,the hole will be <br /> harvest.If problems are observed,the ecologist will make recommendations to City backtilled or tamped to ensure no air pockets. <br /> staff. P <br /> 10. All areas to be revegetated will be decompacted to a depth of 12 inches,being sure to 18. The Riparian Seed Mix(Table 2)will be hand-broadcast and the Upland Seed Mix(Table <br /> leave the finish grade loose.See photos. 3)will be drill-seeded,in the corresponding areas shown on the plans.Seeding will only <br /> be performed between October 1 and when the ground freezes,and when the ground <br /> 11. All areas to revegetated will receive 75 cubic yards per acre of compost.The compost thaws and May 1,unless approved by a qualified ecologist. <br /> will be tilled to a depth of 6 inches after decompaction,leaving the ground surface loose. 19. The Lower Planting Bench will be seeded after planting,whereas the Upper Planting <br /> The compost must meet the following specifications and the actual batch(es)to be Bench will be planted after seeding and blanket installation(planting through the p,D 0 L/�' <br /> applied must be sampled by the project ecologist(or City staff)and sent to a credible blanket . ��R " ' F�s <br /> laboratory for testing prior to use,which requires approximately 14 days: O : '�\AN Rp'• �` <br /> a. pH:5.5-8.0 V�_� •1�<:O <br /> •� 4388 -Z' <br /> DENVER AND BUENA VISTA,CO DENVER AND BUENA VISTA,CO .0� <br /> TEL:303-586-5014 WEB:ALPINE-ECO.COM TEL:303-586-5014 WEB:ALPINE-ECO.COM <br /> S/ONAl- <br /> Print Date: Nov 29. 2023 Sheet Revisions POUDRE PONDS BANK STABILIZATION PROJECT Project No./Code <br /> File Name: Planting Plan.dwg Date: Comments Init. Otak No Revisions: PLANTING NOTES 20119E <br /> CinGreeley' " <br /> 'of� V\. <br /> Revised: Designer: CR Structure <br /> Detailer: KM Numbers <br /> Void: Sheet Subset: Subset Sheets: Sheet Number LS4 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.