My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-07_REVISION - M2002020 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002020
>
2023-12-07_REVISION - M2002020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:20:13 AM
Creation date
12/7/2023 9:40:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002020
IBM Index Class Name
Revision
Doc Date
12/7/2023
Doc Name
Adequacy Review Response
From
City of Greeley
To
DRMS
Type & Sequence
TR3
Email Name
HR1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: <br /> 0' 7.5' 15' 30, ONLY THE TOP TWO COURSES OF <br /> BOULDERS ARE SHOWN FOR <br /> u CLARITY <br /> 1 INCH=30 FEET(11 X 17) <br /> 1 INCH=15 FEET(22 X 34) <br /> ss <br /> o \ \ <br /> \ O <br /> � � o <br /> \ \ \ \ o 0 0 4665 <br /> \ \ o <br /> O <br /> 9x� <br /> O / CO <br /> \ O <br /> � � N <br /> � O <br /> CY) <br /> o \ > <br /> 8FT VOID FILLED RIPRAP APRON \ 0 <br /> SEE SHEET D1 Z <br /> 0 <br /> d q� ALIGNMENT FROM HYDRAULIC MODEL / U <br /> to <br /> LU <br /> 4660 <br /> ��— J <br /> 66 — Z <br /> E. d d a �� ���� CACHE LA PC@ RIVER <br /> 0 <br /> LOWER TWO WALLS TO BE KEYED INTO a , � <br /> r THE BANK A MINIMUM OF 1 OFT AT A <br /> 30 DEGREE ANGLE FROM THE BANK AS <br /> SHOWN. BACKFILL TO EXISTING GRADE da ` <br /> z AND REVEGETATE _ <br /> PROPOSED FENCE �}` — _ _ _4665 <br /> APPROX. 25FT X X1 <br /> SEE SHEET D3 46�0 <br /> d ` <br /> d a d ^ <br /> 6 <br /> LI�F� <br /> EXISTING POUDRE RIVER TRAIL d <br /> BOTTOM ROCK WALL, SEE TYPICAL SECTION ON SHEET Di <br /> LOWER PLANTING BENCH U 4388 z; <br /> N MIDDLE ROCK WALL, SEE TYPICAL SECTION ON SHEET D1 -p <br /> UPPER PLANTING BENCH 'Q• ;•• <br /> SOIL FILLED RIPRAP SLOPE, SEE TYPICAL ••••C�G� <br /> SECTION ON SHEET D1 S�ONA\.` <br /> CRUSHER FINES BUFFER, <br /> SEE SHEET D1 <br /> Print Date: Nov 30, 2023 Sheet Revisions ^ POUDRE PONDS BANK STABILIZATION PROJECT Project No./Code <br /> File Name: Stabilization Plan.dwg Date: Comments Init. Otak i STABILIZATION PLAN <br /> 8 <br /> ctnof/ V\ No Revisions: 20119E <br /> G reeley Revised: Designer: CR Structure <br /> 3 � Detailer: KM Numbers <br /> O Void: Sheet Subset: Subset Sheets: Sheet Number C8 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.