Laserfiche WebLink
Engineering Analytics,Inc. <br /> 1600 Specht Pant Road a Suite 209 v Foit Collins,Co 80525 970488 3111 www enganalyiics com 2008 2023 <br /> w <br /> Technical Memorandum <br /> To: Craig Sparrow From: Jason Andrews, P.E. <br /> Eric Roads, E.I.T. <br /> Company: Western E ui ment and Truck, Inc. Date: November 16, 2023 <br /> EA No.: 111390 <br /> Re: Exhibit E—Reclamation Plan <br /> Applicant: Western Equipment and Truck, Inc. _ •'' •.c'p <br /> Address: 23988 U.S. 34, Kersey, CO - z,:• <br /> 41628 <br /> L` ;;!I W•z3 <br /> Fs O^1F,1.E� <br /> 1.0 POST-MINING LAND USE <br /> Post mine site use will consist of revegetated land seeded with buffalo grass. This post mine land <br /> use is consistent with the current land use and other commercial uses along Highways in this area. <br /> 2.0 TOPSOIL SEGREGATION AND STOCKPILING <br /> Topsoil is the commodity that will be removed from the site. A minimum, 2" of topsoil will be <br /> left for a seed bed. During operations topsoil will be stripped and placed at the location on site for <br /> transport. <br /> 3.0 RECLAMATION SITE GRADING <br /> The final site will be left level for use as a revegetated field. The mining operation will only take <br /> the top 10 to 12 inches of soil and will not leave any pits. Any cut slopes will be regraded with a <br /> minimum of 3(H):1(V) slopes. The revegetation area is shown on Exhibit F attached to this <br /> technical memorandum. No contours are shown on Exhibit F, as the site will be left flat. <br /> 4.0 REVEGETATION <br /> The mined area will be reseeded with buffalo grass at an application rate of 10 pounds of seed per <br /> acre. The seed will be planned by drilling and placement. The reseeding will be completed for all <br /> areas of the site disturbed through topsoil extraction and will consist of about 64.2 acres. <br /> November 16, 2023 / Engineerbig Ana117ics, hic. <br />