My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-04_REVISION - P2010015 (2)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010015
>
2023-12-04_REVISION - P2010015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2023 8:45:26 PM
Creation date
12/5/2023 8:38:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010015
IBM Index Class Name
Revision
Doc Date
12/4/2023
Doc Name
Request For Modification
From
Rio Grande Silver, Inc
To
DRMS
Email Name
TJ1
THM
SMS
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil depth is estimated to range from zero to 12 inches locally. Where present, <br /> topsoil will be salvaged and stockpiled adjacent o drin pads and roads. Once drill pads <br /> and roads are re-contoured and scarified, the salvaged topsoil will be redistributed over <br /> the final graded areas. For reclamation purposes, it is assumed that 4 to 6 inches of <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Drill holes will be abandoned in their entirety upon completion of each drill hole on each <br /> drillpad. All drills holes will be completely filled with a an oni e, and or, bentonite, <br /> cement grout or concrete (plug material) to prevent any vertical movement of ground <br /> water within the drill hole, as well as to eliminate any post-exploration danger to people <br /> and wo'd'ofe that may#8yeFse the aFea. The plug FnateFffial will be plaeed "betteng up" on <br /> each drill hole. A 10 to 20 foot cement plug will cap each drill hole. The cement plug will <br /> ensure that any settlement of the plug material will not a ct the long-term effectiveness <br /> and integrity of the pigging procedure. Plugs will he cnvPrPd during reclamation_ <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Not Applicable <br /> Form 2—Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.