My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-01_REVISION - M1991003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991003
>
2023-12-01_REVISION - M1991003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 9:51:26 AM
Creation date
12/4/2023 10:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991003
IBM Index Class Name
Revision
Doc Date
12/1/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Houston Walker - General Shale Brick, Inc.
Type & Sequence
SI2
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Reclamation Cost Estimate Summary <br /> Site: Tomahawk Mine Permit Action: 2023 Inspection Permit/Job#: M1991003 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 11/2/2023 County: Pueblo Filename: M003-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade Highwall to 31-1:1V DOZER 1 8.77 $2,267 <br /> 002 Spread 6 inches of topsoil over 11 acres DOZER 1 45.56 $11,656 <br /> 003 Revegetation of max. anticipated disturbance REVEGE 1 21.00 $44,130 <br /> 004 Mobilization/Demobilization MOBILIZE 1 8.72 $6,452 <br /> SUBTOTALS: 84.05 $64,505 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,303 <br /> Performance bond: 1.05 Total= $677 <br /> Job superintendent: 42.03 Total= $2,735 <br /> Profit: 10.00 Total= $6,450 <br /> TOTAL O&P= $11,166 <br /> CONTRACT AMOUNT(direct+O&P)= $75,671 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $3,216 <br /> Reclamation management and/or administration: 5.00 $3,784 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $18,665 <br /> TOTAL BOND AMOUNT(direct+indirect)= $83,170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.