My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-27_REVISION - M1985203
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985203
>
2023-11-27_REVISION - M1985203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 8:35:44 PM
Creation date
11/27/2023 9:29:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985203
IBM Index Class Name
Revision
Doc Date
11/27/2023
Doc Name
Request For Conversion
From
Environment, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
BFB
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G — WATER INFORMATION <br /> EXISTING WATER INFORMATION <br /> This will be a dry pit operation with no effect on the water rights or hydrology of the area. Special care <br /> will be taken to prevent any erosion into the Huefano River to the north. <br /> PROPOSED CHANGES <br /> There is no change to the baseline water information presented from 1985. All surface drainages will <br /> remain in their current state and the current drainage patterns on the site will be retained. <br /> No ground water will be exposed at this mine. There is no water source available for dust control or <br /> supplemental irrigation any place close to this site. <br /> The site is in final reclamation. No berms, isolation ditches, or detention ponds remain on site and none <br /> are planned to be implemented in the future. The drainage feature that crosses the mine is not to be <br /> disturbed by any future reclamation activities. <br /> There are no jurisdictional wetlands on the mining operation parts of the new area, therefore no 404 <br /> permit is needed. <br /> No water impoundments,stock ponds, or permanent stormwater ponds were built as part of the <br /> reclamation plan. <br /> 10 <br /> SUMMIT BRICK AND TILE COMPANY- EDMUNDSON CLAY MINE NOVEMBER 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.