Laserfiche WebLink
TABLE 2 <br /> Loveland Ready Mix Concrete,Inc. <br /> Monitoring Well#1,Permit No.297251,Depth to Groundwater Data <br /> (Original Depth to Groundwater= 10.5 feet <br /> Date of Depth Measured Depth Below Notes <br /> Measurement (PVC rim to water) Original Ground <br /> ft (ft) <br /> 3/30/2015 10.93 7.68 Initial reading <br /> 4/30/2015 11.1 7.85 <br /> 5/29/15 11 7.75 <br /> 6/24/15 11.26 8.01 Removing overburden cell <br /> 20 <br /> 7/24/15 12.38 9.13 Mining cell 20 <br /> 8/26/15 12.6 9.35 <br /> 9/28/15 12.96 9.71 <br /> 10/28/15 1 15.01 11.76 <br /> Loveland Ready Mix Concrete, Inc. <br /> Monitoring Well#2,Permit No.297250,Depth to Groundwater Data <br /> (Original Depth to Groundwater= 16 feet) <br /> Date of Depth Measured Depth Below Notes <br /> Measurement (PVC rim to water) Original Ground <br /> (ft) (ft) <br /> 3/30/2015 17.73 13.94 Initial reading <br /> 4/30/2015 17.5 13.71 <br /> 5/29/15 16.8 13.55 <br /> 6/24/15 16.12 12.87 Very wetspring <br /> 7/24/15 17.4 14.15 <br /> 8/26/15 17.42 14.17 <br /> 9/28/15 17.82 14.57 <br /> 10/28/15 17.35 14.10 <br /> Loveland Ready Mix Concrete, Inc. <br /> Monitoring Well#3,Permit No. 297249,Depth to Groundwater Data <br /> (Original Depth to Groundwater>20 feet) <br /> Date of Depth Measured Depth Below Notes <br /> Measurement (PVC rim to water) Original Ground <br /> (ft) (ft) <br /> 3/30/2015 22.06 18.27 Initial reading <br /> 4/30/2015 20.7 16.91 Very wetspring <br /> 5/29/15 19.6 16.35 <br /> 6/24/15 16.8 13.55 Very wetspring <br /> 7/24/15 16.68 13.43 Running irrigation sprinkler <br /> 8/26/15 16.65 13.4 <br /> 9/28/15 17.21 13.96 <br /> 10/28/15 17.56 14.31 <br />