Laserfiche WebLink
Exhibit G-3 <br /> Calculated By: MEO STANDARD FORM SF-3 Project: MA Concrete Rolling Hills <br /> Date: 8/712023 Job No.: 1330-003 <br /> Checked By: PS STORM DRAINAGE SYSTEM DESIGN Design Storm: 100-Year <br /> 100-Year (RATIONAL METHOD PROCEDURE) <br /> 1-hour rainfall= 1.36 =FORMULA CELLS <br /> =USER INPUT CELLS <br /> DIRECT RUNOFF TOTAL RUNOFF STREET PIPE <br /> 1 g <br /> BASIN m0 �N rca zp 'gig a< — aLL y€ �v — au oa' Wo m3 O Wz w� w� REMARKS <br /> U U J <br /> WO n' a p Q KU V" yLL D O Vi a > <br /> t< a <br /> (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13 (14) (15) (16) (17)1 (18)1 (19) (20) (21) 22 <br /> EX-01 EX1 231.60 0.49 56.9 113.99 1.42 162.28 <br /> 8/7/2023 <br /> Major SF-3 E*xhibit G-3 Drainage Calcs.Asx <br />