Laserfiche WebLink
Exhibit G-3 <br /> R1vEFiCm STANDARD FORM SF-2 Project MA Concrete Roll—Hills <br /> -. TIME OF CONCENTRATION SUMMARY Job No.: 1330-003 <br /> Calculated By.MEO Checked By. PS <br /> Date:W2023 <br /> SUB-BASIN INITIALIOVERLAND TRAVELTIME F CHECK FINAL REMARKS <br /> DATA TIME(Q IV (URBAN=BASINS) % <br /> Basin i Cy AREA LENGTH SLOPE h LENGTH SLOPE VEL 4 COMP. TOT.LENGTH Sa tc(Equation 6-5) <br /> A. Ft % Min Ft CV % FPS in F Ft % Min Min <br /> 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 <br /> EX-01 0.02 1 0.05 1231M 340 9.3 18.72 4,214 10 3.1 1.7 40.2 58.9 4,554 3.52 69.3 56.94 <br /> 8/72023 <br /> TOC Exhibit G-3 Drainage Calcs.,Asx <br />