Laserfiche WebLink
stripped. Excess topsoil may be used to cover these slopes with up to 5 feet of topsoil or used <br /> in agricultural projects. <br /> 3.Haul Roads and Access <br /> No change from the previously approved reclamation plan. <br /> Moonscape Pit, November 2023 E1 <br /> 4.Reclamation Timetable <br /> No further reclamation can take place till remaining area is mined. We anticipate this will take 5 <br /> to 7 years. Grading and topsoil replacement will take place as concurrently as much as possible <br /> and should be complete within a year after mining is complete. <br /> S.Revegetation Plan <br /> Revegetation will take place on the 3H:1V slopes. Otherwise, the previously approved <br /> revegetation plan is unchanged. <br /> 6.Post Reclamation Site Drainage <br /> No change from the previously approved reclamation plan. <br /> 7.Revegetation Success Criteria <br /> No change from the previously approved reclamation plan. <br /> 8.Monitoring Reclamation Success <br /> No change from the previously approved reclamation plan. <br />