My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-15_REVISION - M1989056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989056
>
2023-11-15_REVISION - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 9:25:22 AM
Creation date
11/15/2023 10:18:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
Revision
Doc Date
11/15/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Rod Havens McAtee Construction Company
Type & Sequence
SI3
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization of Equipment <br /> Site: Timnath Pit Permit Action: SO-1 Permit/Job#: M1989056 <br /> PROJECT IDENTIFICATION <br /> Task#: 009 State: Colorado Abbreviation: None <br /> Date: 10/30/2023 County: Larimer Filename: 009 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $20.26 $36.04 $47.05 <br /> Operating Cost/Hour: $39.51 $76.08 $82.85 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $82.29 $158.17 $175.95 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8SU 53.08 $255.49 $175.95 2 $862.88 $351.90 $500.00 <br /> Centrifugal pump- 1.95 $18.25 $82.29 1 $100.54 $82.29 $250.00 <br /> 200M,10 in. <br /> Cat657G w/push- 80.25 $379.25 $175.95 4 $2,220.80 $703.80 $1,000.00 <br /> pull <br /> CAT 14M 23.57 $149.33 $82.29 1 $231.62 $82.29 $250.00 <br /> Drill/Broadcast 25.00 $6.73 $82.29 2 $178.04 $164.58 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $25.94 $82.29 1 $108.23 $82.29 $250.00 <br /> (Bowie LD-90) <br /> Subtotals: $3,702.11 $1,467.15 $2,500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,5,000 Gal. $162.53 1 $162.53 $162.53 <br /> Fuel Tanker,6x4,210 HP $93.16 2 $186.32 $186.32 <br /> Subtotals: $348.85 $348.85 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.