My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-15_REVISION - M1989056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989056
>
2023-11-15_REVISION - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 9:25:22 AM
Creation date
11/15/2023 10:18:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
Revision
Doc Date
11/15/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Rod Havens McAtee Construction Company
Type & Sequence
SI3
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#006 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Spread Topsoil Over Affected Area <br /> Site: Timnath Pit Permit Action: SO-1 Permit/Job#: M1989056 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 10/30/2023 County: Larimer Filename: 006 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 657G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA 25 50 25 <br /> Ownership cost/hour: $379.25 NA NA $241.38 $149.33 $57.13 <br /> Operating cost/hour: $358.77 NA NA $35.98 $46.40 $16.62 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA NA $0.00 $0.00 $0.00 <br /> Operator cost/hour: $47.28 NA NA $40.04 $46.87 $38.91 <br /> Unit Subtotals: $785.30 NA NA $317.40 $242.60 $112.66 <br /> Number of Units: 4 0 0 1 1 1 <br /> Group Subtotals: Work: $3,141.20 Support: $317.40 Maine $355.26 <br /> Total work team cost/hour: $3,813.86 <br /> MATERIAL QUANTITIES <br /> Initial volume: 69,777 CCY Swell factor: 1.000 <br /> Loose volume: 69,777 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 32.00 LCY <br /> Material description: Top Soil Heaped Volume: 44.00 LCY <br /> Rated Payload: 104,000 pounds Average Volume: 38.00 LCY <br /> Payload Capacity: 65.00 LCY Adjusted Capacity: 38.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.