My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-03_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2023-11-03_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 10:49:01 AM
Creation date
11/13/2023 10:46:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
11/3/2023
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> Colowyo originally applied for a partial Phase 11 Bond Release for 148.4 acres associated with the <br /> East and West Pit as shown on Map 1 of the SL-22 application and Figure 1 of this document. The <br /> bond release area is located in the Colowyo Coal Mine's East and West Pits in portions of <br /> Township 3 North, Range 93 West of the 6th Principal Meridian, Section 9 — S 1/2 , NW 1/4 SW <br /> 1/4, NE '/4 E 1/2 and Section 10 — SW '/4 SW '/4. The permit area can be found on the USGS <br /> Quadrangle 7.5 Minute Series Maps of Axial and Nine Mile Gap. The permit area and surface <br /> ownership can be found on Map 1, and the coal ownership can be found on Map 2 of the <br /> Colowyo Permit Application Package (PAP). <br /> Background <br /> The East Pit and West Pit mining sites lie just west of the northward flowing Goodspring (also <br /> referred to as Good Spring) Creek, which is paralleled by Colorado Highway 13. The area <br /> includes gently sloping uplands and valleys that cut into the upland surface. These valleys are <br /> generally narrow, v-shaped, and about 250 to 500 feet deep. Elevations range from <br /> approximately 7,650 feet in the upper portion of East Pit reclamation to 6,950 feet near East <br /> Taylor Pond. <br /> Mining operations began in 1976 with the East Pit, a multi-seam coal operation that continued to <br /> move in a southerly direction. Eight coal seams (Y, X, A, B, C, D, E, F) were mined from the <br /> East Pit, ranging in thickness from two to fifteen feet. The East Pit is nearly 6,000 feet from east <br /> to west(width), 1,000 feet in breadth(highwall to highwall), and 450 feet deep. Due to the <br /> number of coal seams, immense size of the pit, and manpower and equipment employed, pit <br /> progression was slow, with additional disturbances of approximately 40 to 50 acres per year. <br /> Extraction of coal from the East Pit was terminated in 2006. All reclamation activities have been <br /> completed in the East Pit and is in the required final revegetation stages. <br /> The West Pit is located to the west of the East Pit. The method of operation utilized in, and the <br /> coal seams extracted from, the West Pit were the same as those of the East Pit. The West Pit was <br /> roughly the same overall size as the East Pit. Mining in the West Pit advanced from the north to <br /> south, paralleling the movement of the adjacent East Pit. Mining operations in the West Pit were <br /> completed in 2015. Reclamation activities remaining in the West Pit include backfilling, <br /> grading, reduction of the highwall, and vegetation. <br /> Colowyo is continuing to perform reclamation maintenance and activities in the East Pit and <br /> West Pit. Reclamation in the East Pit and West Pit is expected to conclude in 2032 with <br /> associated parcels related to the remaining in-pit haul road. <br /> Operations in the South Taylor Pit began after the approval of PR-02 in 2007. This pit is located <br /> north and west of the northward flowing Good Spring Creek and southwest of the West Pit. It <br /> lies partially in Rio Blanco County. In the South Taylor Pit, 17 seam and sub-seam complexes <br /> Proposed Decision and Findings of Compliance November 3,2023 <br /> Partial Phase 11 Bond Release SL-22 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.