Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is approximately 10 inches in depth. Topsoil on affected areas will be stockpiled <br /> and saved for reclamation. Topsoil will be used to cap reclaimed sand. Redistribution <br /> depth will be the same depth as the topsoil removed, approximately 10 inches. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> N/A <br /> S. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> The topsoil excavated from all exploration test pits will be stockpiled near the <br /> disturbance area. This stockpiled topsoil will be utilized to cap and reclaim the <br /> excavated sites. In the event that the material extracted from the drill holes is <br /> insufficient for backfilling, sand from the tailings at AuPt's existing Permit M2016081 will <br /> be utilized as a supplement. To restore the disturbed areas, seeding and imprinting <br /> activities will be carried out in October. <br /> Form 2—Public File Page 9 q/14 <br />