Laserfiche WebLink
Table 2 <br /> Bowie No. 1 Mine Bond Release History <br /> Initial Liability East Mine West Mine Loadout Total Comments <br /> Includes indirect costs pro-rated <br /> RN-04 Estimate $2,813,527.78 $1,059,606.98 $3,006,455.35 $6,879,590.12 for each area. <br /> All MRs/TRs after RN-04 and prior <br /> Revisions $118,677.31 $118,677.31 to SL-02 <br /> $6,998,267.43 <br /> Surety Releases to <br /> Date East Mine West Mine Loadout Total Comments <br /> SL-01 $0.00 $0.00 $0.00 $0.00 Application Withdrawn <br /> Phase I release on portions of the <br /> SL-02 $434,803.00 $709,004.00 $0.00 $1,143,807.00 East and West Mines(13.1 ac and <br /> structures on the West Mine and <br /> structures only on the East Mine). <br /> 60%of total structural demolition <br /> SL-03 $0.00 $0.00 $1,136,354.00 $1,136,354.00 costs for all structures included in <br /> bond release. <br /> SL-04 $1,278,543.70 $0.00 $0.00 $1,278,543.70 Phase I release on 69.6 ac of the <br /> East Mine. <br /> Phase 11 release on 13.1 ac of the <br /> West Mine and 10.2 ac of Phase 11 <br /> release on the East Mine; Phase I <br /> SL-05 $76,677.16* $197,166.37* $0.00 $175,373.56* release of 1.0 acres of the West <br /> Mine Fan Area.*per Rule <br /> 3.03.1(2)$98,469.97 was <br /> deducted to ensure the minimum <br /> retention amount was achieved. <br /> Phase I release on 2.31 acres <br /> associate with the West Ridge <br /> Pond,Binwall Ponds 1 through 4, <br /> and the ROM Pile Pond;Phase 11 <br /> SL-06 $484,986.72 $0.00 $0.00 $484,986.72 release of 58.84 acres of the East <br /> Mine composed of the 48.88 <br /> acres of the East Mine and 9.96 <br /> acres of land associated with the <br /> Haul Road cut and fill. <br /> Phase 11 release on 0.51 acres of <br /> SL-07 $50,653.84 $0.00 $0.00 $50,653.84 the East Mine ROM pond and <br /> 10.38 Phase III release of the <br /> ROM pond and pile area. <br /> SL-08 $0.00 $60,430.00 $0.00 $60,430.00 Phase III release of 12.31 acres at <br /> the West Mine. <br /> SL-09 $265,217.95 $0.00 $0.00 $265,217.95 Phase III release of East Mine, <br /> excluding Ponds 1-4. <br /> SL-09 Findings,Permit C-1981-038 Page 12 of 12 <br />