Laserfiche WebLink
earthen berms above outslopes,compacted earthen operations pad area, and earthen detention <br /> impoundments of sufficient capacity for runoff and sediment control. These structures already largely <br /> exist on the affected area,and there are no engineered specifications for them. <br /> (b) <br /> The operator worked with WQCD to incorporate Stormwater Management conditions into our CDPS <br /> Permit,and so all stormwater is either contained on-site,or is discharged to the sediment control pond <br /> and Outfall 001 through CDPS Permit No.CO0038334. <br /> The Stormwater Management Plan is now attached in this submittal, prepared by Lewicki and Associates <br /> on behalf of the Applicant. <br /> (11) <br /> Surface water quality data for this site in this segment of South Mosquito Creek has been collected to <br /> verify efficacy of recent water clean up efforts. CDPHE and MineWater entered into Compliance Order <br /> and Settlement Agreement IC160803 which provides for monthly sampling of South Mosquito Creek at <br /> SMC003. MineWater has conducted all required sampling pursuant to the Compliance Order on Consent. <br /> A recent cover letter for our monthly sampling pursuant to the Consent Order is excerpted here: <br />