Laserfiche WebLink
v ppm 4 3 12 21 11 42 18 19 <br /> w ppm 0.1 0.1 0.5 0.4 0.4 3.1 10.5 12 <br /> Y ppm 0.8 1 5.2 6.2 5.1 11 8.9 9.2 <br /> Zn ppm 390 156 23 11 14 9280 5700 5290 <br /> Zr ppm 0.8 1.8 23.6 27.8 23.7 23.6 35.6 34.7 <br /> Deportment of heavy metals in the sorting plant is demonstrated by the attached analytical results: <br /> Table 3: Sample 1094 London Mine - assay results <br /> KCA Bucket 1 Bucket 2 Bucket 3 Total Assay 1,oz Assay 1,oz Assay I.oz Assay 2.oz Assay 2,oz Assay 2,oz Average. <br /> Sample No. 0 Client r Test Wt.kg Wt,kg Wt.,kg Wt_kg Au'st Autst Auist AuM Aufst Autst oz Au/st <br /> 93427A 1 1094 441.1.2 26,74 26.74 01480 0.1550 01580 02650 0.1670 0.1700 0.1772 <br /> 93428 A 2 1094 441-2? 25.72 2072. 46.44 0.0163 0.0185 0.0146 00193 OA166 0.0136 0.0165 <br /> 93429 A 3 1094 441.3.1 24.98 24.98 0.0127 0.0157 0.0044 0-0260 0,0062 0.0130 <br /> 93430A 4 1094 4413.2 25.50 7,90 10.72 44,12 0.0054 0,0048 0.0062 0.0054 0,0055 <br /> KCA Bucket 1 Bucket 2 Bucket 3 Total Assay 1,oz Assay 1,oz Assay 1,oz Assay 2,oz Assay 2,oz Assay 2,oz Average. <br /> Saaple No. Client Test Wt_kg Wt.,kg Wt-kg Wt_kR ApVst AgIst A /st Airst AWst A 'st ozA st <br /> 93427 A 1 1094 441.1.2 2634 26.74 1.20 115 1.36 134 126 <br /> 93428 A 2 1094 441.2 2 25.72 20 72 46,44 0.10 0,11 Oil 0.10 0.10 <br /> 93429A 3 1094 441.3.1 24.98 24.98 0.03 0.02 Obl 0.03 0.03 <br /> 93430 A 4 1094 441.3.2 25.50 7.90 1032 44.12 0.03 0.03 002 0.03 0.03 <br /> Figure 3 Heavy metal concentration ratios:Au 10.7x,Ag 12.6x <br /> Sorted product was analyzed for total metals, sulfur and other constituents. Samples 813-817 represent <br /> sorted (inert)waste. <br /> (7) <br /> The Environmental Protection Facilities associated with this operation involve the operations pad where <br /> stockpiling and sorting will occur,sediment control impoundments/berms,sorting equipment, and <br /> buildings onsite. Being an operation involving dry materials, no impoundment liner and no concrete pad <br /> are deemed necessary. The capacity of the stockpile area and operations pad will not be exceeded, <br /> ensuring no release or excursion of materials or contaminants. Nevertheless,the sorter machinery will <br /> be located within a 60 foot wide, 60 foot long and 30 foot tall industrial building attached to a baghouse <br /> for negative air pressure into the building,so that dust will be contained from the sorting operation.The <br /> building will be located and affixed to a concrete pad.Also,the stockpile area will be graded to drain <br /> toward the sediment pond connected to Outfall 001 of CDPS Permit No.C00038334,which is monitored <br /> continuously for flow,and sampled weekly for metals, pH,and other permitted contaminants. <br /> The surfaces to be operated upon are earthen. They will be graded and compacted,with earthen berms <br /> at the margins. Proper drainage and slope stability will ensure overall containment within the permit. <br /> The buildings to be utilized for storage of equipment, materials and fuels currently exist onsite in <br /> functional condition. These will be monitored and maintained for the duration of this permit. <br /> No stockpiles of mineralized materials will be left on the stockpile area or operations pad for significant <br /> length of time;all will be either removed from the site or stably placed in permanent locations. All fuel, <br /> lube and other fluids will be securely stored away from weather and with adequate impermeable <br /> secondary containment. Buildings will be maintained and secured when the site is not active. <br />