My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:10:00 AM
Creation date
11/1/2023 10:01:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendices H-I - Diversion Channel Design
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1670 BROADWAY, SUITE 3400 <br /> EXISTING BENCH DENVER, COLORADO 80202 <br /> (WIDTH VARIES) (303) 764-1520 <br /> (WIDTH VARIES) <br /> EL 6871 .4 <br /> SEE CROSS SECTION SHEETS <br /> FOR APPROXIMATE LIMITS <br /> PRE—RECLAIMATION HIGH WALL O O O O O <br /> TO REMAIN UNDISTURBED <br /> BEYOND LIMITS OF DEMO SURFACE <br /> O O O O O <br /> , MINIMUM <br /> I N O EXISTING AND <br /> \ EL 6872.2 <br /> 20 GRADE TO DRAIN <br /> O <br /> �. REMOVE DEBRIS, FALLEN O O O O O O <br /> � <br /> ROCKS SOILS AND THE LIKE/ <br /> PRIOR TO CHANNEL INSTALLATION PRE—RECLAIMA ION <br /> 7110 BENCH APRON DETAIL <br /> MAX 0.5:1 �� <br /> NOT TO SCALE <br /> NOTES: <br /> S=0.0% 1 . RIPRAP INSTALLATION. THE ROCK RIPRAP SHALL BE PLACED BY HAND ON THE SURFACE AND TO THE DEPTH <br /> EX GROUND EXCAVATE/ROCK CUT 1 .5' MIN SPECIFIED. IT SHALL BE SECURELY BEDDED WITH THE LARGER ROCKS FIRMLY IN CONTACT ONE TO ANOTHER <br /> POST DEMO BELOW CHANNEL FINISHED WITHOUT BRIDGING. SPACES BETWEEN THE LARGER ROCKS SHALL BE FILLED WITH SMALLER ROCKS AND SPALLS. <br /> { ) GRADE INVERT ELEVATIONS SMALLER ROCKS SHALL NOT BE GROUPED AS A SUBSTITUTE FOR LARGER ROCK. <br /> SHOWN IN PROFILE <br /> TYPICAL BENCH DEMO SECTION <br /> NOT TO SCALE <br /> 3' 3' 3' <br /> (WIDTH VARIES) <br /> SEE CROSS <br /> SECTION SHEETS <br /> CUT SLOPE SEE NOTE 4 <br /> 1 ' 1 ' 6' 6' 1 ' 1 " <br /> I <br /> 2' <br /> EXIST GROUND 20' <br /> \2"7 ELEV VARIES 21/ <br /> MATCH EXIST \ _ _ / MATCH EXIST <br /> BENCH/GROUND / I 2 I 2 \ GRADE <br /> 7.5.\ <br /> . � 7• <br /> S <br /> / TRANSITION CONDITION. O�O�O�O O�O�O � 7 <br /> 2� / BETWEEN STATIONS <br /> FINISHED / 17+25 — 17+75 ANCHOR LINER , <br /> PRE—RECLAIMATION/ GRADE / / 18" MIN �'���� ,������ ����� �r`�\ ` 10 MIN <br /> EX GROUND 2% MATCH EXIST SEE NOTE 5 <br /> (POST DEMO) 2 I 2 �,�,� \ BENCH/GROUND \�''� � �// o ��� SEE NOTE 3 <br /> BEDDING �� GEOTEXTILE <br /> 7.S- CLASS 1 <br /> 1 ' GENERAL FILL _ — \ \1 2' NON—WOVEN <br /> RIPRAP <br /> D50: 12, <br /> 1 ' COMPACTED CLAY FILL 1 , � �� o 0 0 0 0 0 /// 1 TYPICAL ROCK CHUTE CHANNEL <br /> EX GROUND SECTION STA 19+45 TO 27+02 <br /> GEOCOMPOSITE LINER "���/���i�� � � r�� (POST DEMO) NOT TO SCALE <br /> 24" OF D50 = 12" RIPRAP <br /> NOTES: <br /> NOTES: 1 . PREPARE SUBGRADE IN ACCORDANCE WITH GEOCOMPOSITE MANUFACTURER RECOMMENDATIONS. IN AREAS WHERE HARD <br /> 1 . PREPARE SUBGRADE IN ACCORDANCE WITH ROCK MATERIAL IS ENCOUNTERED, PLACE AND COMPACT A MINIMUM 6 INCHES OF COMPACTED BEDDING MATERIAL. <br /> GEOCOMPOSITE MANUFACTURER RECOMMENDATIONS. 2. RIPRAP INSTALLATION. THE ROCK RIPRAP SHALL BE PLACED BY HAND ON THE SURFACE AND TO THE DEPTH SPECIFIED. <br /> IN AREAS WHERE HARD ROCK MATERIAL IS IT TYPICAL BENCH CHANNEL SECTION STA 10+00 TO 19+45 SPACESLBBETWEENUTHEYLARGERD WITH THE ROCKS SHALL RGER BEFILLOEDKS FIRMLY IN CONTACT WITH SMALLER ROCKS ONE TO AND SPALLSOTHER WITHOUT S SMALLER ROCKS SHALLNOT <br /> ENCOUNTERED, PLACE AND COMPACT A MINIMUM 6 <br /> INCHES OF COMPACTED BEDDING MATERIAL. NOT TO SCALE BE GROUPED AS A SUBSTITUTE FOR LARGER ROCK. <br /> 2. RIPRAP INSTALLATION. THE ROCK RIPRAP SHALL 3. SLOPE SUPPORT BENCH TO BE CONSTRUCTED AS SHOWN ON PLAN OR WHERE TOP OF CHANNEL ELEVATION TO EXISTING <br /> BE PLACED BY HAND ON THE SURFACE AND TO GRADE/TOE DAYLIGHT IS GREATER THAN 20' VERTICALLY. <br /> THE DEPTH SPECIFIED. IT SHALL BE SECURELY 4. DESIGN GRADES AND DAYLIGHTS BASED UPON JUNE 2023 TOPOGRAPHY. NOTIFY ENGINEER AND ADJUST ALIGNMENT TO <br /> BEDDED WITH THE LARGER ROCKS FIRMLY IN REDUCE HORIZONTAL CUT DISTANCES GREATER THAN 5' OR CANNOT BE SAFELY GRADED TO DAYLIGHT DUE TO FIELD <br /> CONTACT ONE TO ANOTHER WITHOUT BRIDGING. CONDITIONS ENCOUNTERED. <br /> SPACES BETWEEN THE LARGER ROCKS SHALL BE 5. INSTALL LINER PER MANUFACTURER RECOMMENDATIONS INCLUDING ANCHOR TRENCHES AND TOEDOWNS. <br /> FILLED WITH SMALLER ROCKS AND SPALLS. <br /> SMALLER ROCKS SHALL NOT BE GROUPED AS A <br /> SUBSTITUTE FOR LARGER ROCK. <br /> Rev. DATE DESCRIPTION Designed By: ZS PLO ��C Scale: (As Shown) HOLCIM-WCR, INC <br /> ..... <br /> Drawn By: ZS °'gco 'L Date Created: 11 /01 /2022 MORRISON QUARRY DRAINAGE DIVERSION <br /> MISCELLANEOUS DETAILS <br /> Checked By: AC 24 lot Date: 9/1 /2023 F.I.R. Date: HOLCIM <br /> /01/P'23.. �, <br /> File: C-501 .dwg ��.�Fs ... ��� F.O.R. Date: For Const. Date: <br /> S/ONAL � Sheet Of <br /> Project No.: 10338120 (i-5�� 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.