Laserfiche WebLink
WHIRLWIND MINE, PERMIT NO. M-2007-044 <br /> THIRD QUARTER 2023 HYDROLOGICAL REPORT <br /> Attachment 2. Whirlwind Decline <br /> Dissolved peci isOxygen- <br /> Monitoring Sample Inflow Rate(') Field pH Temperature Oxygen Conductance Reduction <br /> Date Location (gpm) (s.u.) (deg.C) (mg/L) (US/cm) Potential (mV) Comments <br /> 3/10/2008 WW Sump 2.4 8.30 11.0 NM NM NM See Table 1 <br /> 6/19/2008 WW Sump 2.8 10.26 11.5 0.78 592 114 See Table 1 <br /> 9/8/2008 WW Sump 2.2 9.11 11.0 8.48 649 62 See Table 1 <br /> 12/16/2008 WW Sump 1.7 8.75 10.7 5.22 609 149 See Table 1 <br /> 3/5/2009 WW Sump 2.1 8.52 11.1 8.24 618 151 No analytical samples collected <br /> 4/20/2009 WW Sump 2.2 8.41 11.2 6.68 626 177 No analytical samples collected <br /> 8/11/2009 WW Sump 1.6 8.76 11.9 6.44 599 152 No analytical samples collected <br /> 12/1/2009 WW Sump 1.4 8.61 11.5 6.54 624 160 No analytical samples collected <br /> 2/2/2010 WW Decline 2.0 7.06 11.3 7.02 597 170 No analytical samples collected <br /> 4/21/2010 WW Decline 1.9 8.07 12.3 6.76 576 201 See Table 1 <br /> 9/8/2010 WW Decline 1.7 8.65 11.9 4.53 592 133 No analytical samples collected <br /> 11/4/2010 WW Decline 3.4 8.49 11.6 2.22 578 207 No analytical samples collected <br /> 2/7/2011 WW Decline 1.7 8.49 11.3 2.26 590 151 See Table 1 <br /> 6/20/2011 WW Decline 1.2 8.17 11.7 2.42 620 159 No analytical samples collected <br /> 8/20/2011 WW Decline 1.3 8.54 11.6 2.54 644 163 No analytical samples collected <br /> 10/25/2011 WW Decline 1.0 8.48 11.5 2.63 618 157 No analytical samples collected <br /> 11/9/2011 WW Decline 1.0 8.19 11.5 3.09 631 234 See Table 1 <br /> 3/28/2012 WW Decline 1 0.7 8.32 1 11.5 1 2.41 1 592 1 173 See Note 2 <br /> (1) From First Quarter 2008 to Fourth Quarter 2009, the inflow rate was estimated over the quarter by calculating the volume of water pumped out of the mine and treated <br /> and estimations of the volume of water evaporated off the untreated water tank and brought out of the mine as moisture in waste rock, ore, and ventilated air.As of the First <br /> Quarter 2010,water inflow is estimated based on the approximate water elevation and the void volume of the mine workings. <br /> (2)Access to the mine was temporarily restricted as of the third quarter 2012. Inflow rate measurements will be resumed when the portal is reopened. <br />