My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:52 AM
Creation date
11/1/2023 9:14:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Final Phase III Drainage Report
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The report was prepared under the direction of an engineer licensed in Colorado, certified as <br /> shown below in for the Phase III report. <br /> "This report for the Phase III drainage of Morrison Quarry was prepared by me(or under my <br /> direct supervision) in accordance with the provisions of Jefferson County Storm Drainage <br /> Design and Technical Criteria and was designed to comply with the provisions thereof. I <br /> understand that Jefferson County and the Town of Morrison do not and will not assume <br /> liability for drainage facilities designed by others." <br /> Samuel Acosta <br /> Registered Professional Engineer <br /> State of Colorado No. 54270 <br /> (Affix Seal) <br /> �P�. ..... �C�C <br /> OpQ`SJ�� D.q °s2`�'� <br /> U � 52470 <br /> '':b9/01/2 'c� <br /> �Fs' ....... <br /> S/ON4 <br /> Holcim-WCR, Inc. hereby certifies that the drainage facilities for the Morrison Quarry will be <br /> constructed according to the design presented in this report. I understand that Jefferson County <br /> and the Town of Morrison do not and will not assume liability for drainage facilities designed or <br /> reviewed by my engineer. I also understand that Jefferson County and the Town of Morrison <br /> relies on the representations of others to establish that drainage facilities are designed and built <br /> in compliance with applicable guidelines, standards or specifications. Review by Jefferson <br /> County and the Town of Morrison can therefore in no way limit or diminish any liability which I <br /> or any other party may have with respect to the design. Q <br /> (Owner/A p'cant) - l� lr"ram r f Ln v <br /> By: � <br /> Date 4I/7 12 3 <br /> 1670 Broadway,Suite 3400,Denver,CO 80202-4824 hdrinc.com <br /> (303)764-1520 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.