My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:52 AM
Creation date
11/1/2023 9:14:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Final Phase III Drainage Report
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1-2. Existing Sub-basin Characteristics Summary <br /> Drainage Areaa Description Drainage Area Runoff Outfall <br /> (acres) <br /> 01A and 01B Unnamed Drainage 2 58 Off-Siteb <br /> 02 Main south quarry 52 Outfall 003, Outfall 006 <br /> 03 Unnamed Drainage 1, 88 Detained in central quarry or <br /> west quarry haul road, south quarry and pumped to <br /> and the central quarry Outfall 003 or Outfall 006c <br /> 04 Eastern south quarry 10 Detained in eastern portion <br /> of south quarry and pumped <br /> to Outfall 006c <br /> 05 Strain Gulch upstream of 330 Conveyed beneath the north <br /> Site quarry and processing area in <br /> an existing 72-inch culvert <br /> 06 North quarry 80 Contained in Reservoir Site <br /> 11 <br /> 07 Processing area 28 Outfall 005 <br /> 08 Main quarry haul road 12 Outfall 001 <br /> 09 Bottom of main quarry 1 Outfall 004 <br /> haul road below <br /> sediment basin <br /> a. As shown on Drainage Area Maps in Appendix B <br /> b. Previously included to compare with proposed conditions, no change from existing condition proposed <br /> c. Runoff will be pumped to an outfall if it has not infiltrated within 72 hours <br /> Drainage areas 01A and 01 B are for Unnamed Drainage 2 (UD2), which is partially within the <br /> property boundary but is unimpacted by quarry development. UD2 flows from west to east into <br /> Turkey Creek south of US-285. This drainage area was previously included to compare with <br /> proposed conditions; however, the Phase III design does not impact 01A and 01 B. <br /> Drainage area 02 consists of the south quarry which includes the upper highwall and benches <br /> and lower portions of the west quarry haul road. Runoff from drainage area 02 reports to Outfall <br /> 003 and Outfall 006. Outfall 003 discharges into the existing UD3 channel downstream of the <br /> Site. The downstream UD3 channel flows into Turkey Creek approximately one mile <br /> downstream of the outfall. Outfall 006 discharges to UD2 downstream of the Site. If the flow <br /> enters the south quarry depression, the accumulated runoff is allowed to infiltrate or is pumped <br /> to Outfall 003 within 72 hours. <br /> Drainage area 03 consists of Unnamed Drainage 1 (UD1)which is upstream of the Site, upper <br /> portions of the west quarry haul road, and the central quarry. The drainage area for UD1 <br /> upstream of the Site is 30 acres of undeveloped land located within the Mount Falcon Open <br /> Space Park. UD1 flows into the site between the south and central quarries and ultimately flows <br /> either down the newly constructed west quarry haul road to the eastern portion of the south <br /> quarry or into the depression created by the south quarry. If the flow enters the south quarry <br /> 1670 Broadway,Suite 3400,Denver,CO 80202-4824 hdrinc.com <br /> (303)764-1520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.