Laserfiche WebLink
Ninth Technical Revision(TR09)to Permit M-1973-021,Holcim-WCR,Inc.Morrison Quarry <br /> 4 Exhibit F — Reclamation Plan Map <br /> Exhibit F-1 includes the West and South Quarry reclamation plan map. Exhibits F-1A— F-1 C present <br /> cross sections. These maps reflect the reclamation approved in AM07 with the exception of the <br /> bottom floor elevation being at El. 6,600 based on groundwater elevations in the pit. All final <br /> reclamation elements to be completed at this elevation (i.e. grading, drainage, revegetation) remain <br /> unchanged from AM07, with the exception of the final grading of the South Quarry floor(El. 6,600) at <br /> a 3% slope (southwest or northeast) to convey stormwater to Outfall 003 and the main quarry <br /> access road. <br /> October 2023 1 13 <br />