Ninth Technical Revision(TR09)to Permit M-1973-021,Holcim-WCR,Inc.Morrison Quarry <br /> 6 Exhibit I — Reclamation Costs <br /> This section contains costs associated with reclaiming the Satellite South Pit at the Morrison Quarry. <br /> Reclamation is anticipated to proceed after Satellite South Pit mining is complete. A plan view <br /> showing the reclamation scenario is shown in Exhibit F-1. Table 3 summarizes Satellite South Pit <br /> reclamation costs. <br /> i alDie 3. Satellite South Pit (<El. 6,600) Reclamation Costs Detail <br /> 1.0 Mobilization/Demobilization % 1 10% $2,476,904.16 <br /> 2.0 Mined Areas Direct Reclamation Costs—Earthmoving' <br /> 2.1 Drill and Blasting CY 1,300,000 $6.46 $8,404,397.99 <br /> 2.2 Fill and Compaction CY 2,648,832 $6.12 $16,206,643.61 <br /> 2.3 Compaction Testing Day 48 $1,000 $48,000 <br /> 3.0 Dewatering Mo 11 $10,000 $110,000 <br /> Mined Area Total Earthmoving Cost $24,769,041.60 <br /> Indirect Reclamation Costs <br /> 3.0 Performance Bond % $13,919,545.96 1.50% $371,535.62 <br /> 4.0 Administration % $13,919,545.96 1.50% $371,535.62 <br /> $27,989,017.01 <br /> 'Due to proposed Satellite South Pit backfill being completed to El.6,600,survey,erosion control,final grading, revegetation,and <br /> dewatering cost are not included in this estimate. Costs for these services were included in the reclamation bond <br /> calculated in AM07(refer to Table L-7). <br /> October 2023 1 20 <br />