My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:55 AM
Creation date
11/1/2023 8:16:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendix E - Hydrology
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim-WCR,Inc. I Morrison Quarry Drainage Report <br /> Appendix E—Hydrology <br /> • Drainage 03— Flows continue to be managed by routing to the Central Quarry. The <br /> hydrologic boundary is updated to reflect the installed haul road and proposed drainage <br /> diversion. No culverts or takeoffs were installed during haul road construction, and it is <br /> anticipated that flows will be collected and conveyed along the haul road to the Central <br /> Quarry as shown in Appendix B. <br /> • Drainage 04—This drainage is now incorporated within Drainage 02B and requires no <br /> additional analysis. <br /> • Drainage 06—The hydrologic boundary at its far south end was adjusted slightly where <br /> mine construction activity has occurred. The adjustment reduces the area of Drainage <br /> 06 by approximately 2% and was not included in this analysis because the change does <br /> not significantly alter the site drainage characteristics nor affect the proposed diversion <br /> design. <br /> Model Parameters and Assumptions <br /> The hydrological assumptions generally follow the CUHP guidelines and are consistent with the <br /> Phase II Drainage report. The following tables summarize the inputs used for the calculations. <br /> All areas are hydrologic soil group D with variation in the impervious areas based upon land <br /> use. <br /> The precipitation input is for both the 100-year and 5-year return periods for Morrison and can <br /> be seen in the calculation workbooks attached. <br /> Table 1 — Hydrologic Input <br /> Drainage Proposed Area Flow Path Length Percent <br /> Identification - - <br /> s) Impervious <br /> 02A 15 0.405 25 <br /> 02B 55 0.327 50 <br /> 03 87 1.401 50 <br /> Hydrological Results <br /> The CUHP input and output workbooks are attached to this calculation. The table below <br /> summarize the results presented in the Appendix B proposed drainage figure. <br /> Table 2— Hydrological Results <br /> Drainage Identification - 100-Year <br /> VF(`cfs) (cfs) VP <br /> 02A 6.6 25.4 <br /> 02B 67.3 201.8 <br /> 03 48.9 151.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.