Laserfiche WebLink
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> REVISIONS SCHEDULE <br /> Revisions to this Stormwater Management Plan (SWMP) will be made as required or at the <br /> request of the Colorado Department of Public Health and Environment (CDPHE).This SWMP can <br /> be revised at any time that it is judged appropriate to meet the stormwater pollution control <br /> objectives. Typically revisions are made: <br /> • When there is a change in design, construction, operations or maintenance in the <br /> regulated facility that may significantly impact the regulated stormwater discharges from <br /> the facility; <br /> • When conditions occur or develop which can be reasonably expected to significantly <br /> impact stormwater discharges from regulated areas of the facility; or <br /> • When there is a change to the nature of pollutants discharges in stormwater. <br /> Revisions will generally be made within 30 days after the occurrence or completion of the action <br /> giving rise to the revision. Changes will be incorporated by appropriately dated addendum, <br /> additions, changes or attachments. <br /> Revisions are inserted into this plan with the appropriate revision numberand revision date noted <br /> at the top of the page. Revisions are tracked on the following table: <br /> REVISION NO. DATE PERFORMED BY SECTIONS REVISED / COMMENTS <br /> 1 January 2017 Christine Felz <br /> 2 July2019 Chloe Soik 1.3 /2.2 /3.1.2 /3.1.7 /3.1.8 /5 /5.2 <br /> Compliance Action Checklist <br /> 3 January 2020 Chloe Soik 1.2 / 1.3 /3.1.2 /3.1.3 /3.1.4 /8.1 <br /> Changed Fact File to Stormwater Binder <br /> Figure 1 <br /> 2.2 /3 / 6.3 <br /> 4 January 2020 Chloe Soik Appendices <br /> Figure 2 <br /> 5 August 2020 Jeremy Pritchett 2.2 /4.12 <br /> Jeremy <br /> 6 June 2021 2.2 <br /> Pritchett <br /> 5 <br />