Laserfiche WebLink
pH, (Minimum- <br /> Maximum) S.u. NA NA 6.5-9.0 2x/month Grab <br /> 00400 <br /> Total Suspended <br /> Solids, mg/l 30 45 NA 2x/month Grab <br /> 00530 <br /> Oil and Grease Visual NA NA NA 2x/month Visual2 <br /> 84066 <br /> Oil and Grease, mg/l NA NA 10 Contingent2 Grab <br /> 03582 <br /> Site Specific Limitations <br /> Electrical <br /> Conductivity (EC), dS/m Report NA NA Quarterly Grab <br /> 00094 <br /> Phosphorus, Total' mg/l Report NA NA Monthly Grab <br /> 00665 <br /> 1: Flow - The chronic flow limit is equal to the flow rate provided in the permit application, and will be <br /> stated on the certification. If power is not available, flow may be measured on an instantaneous basis. <br /> 2: Oil and Grease: - A visual observation of the discharge for each permitted outfall must be made <br /> 2x/month. In the event an oil sheen or floating oil is observed, a grab sample shall be collected, <br /> analyzed, and reported on the DMR. In addition, corrective action shall be taken immediately to <br /> mitigate the discharge of oil. <br /> 3: Total Phosphorus - Analysis for Total Phosphorus, as P, will be included in the permit certification <br /> for all discharges to waters with a control regulation for P. <br /> Stormwater Monitoring Requirements <br /> Permit Limitations and/or Monitoring Requirements apply to outfall(s) 001A, 003A, 004A, and 006A as <br /> outlined in the Permit in Part I.C.2 and Parts I.G through I.Q. <br /> On the effective date of this certification, the Morrison Quarry is subject to the monitoring requirements <br /> identified below at each discharge point of stormwater from the facility. <br /> A. Visual monitoring, Part U.1 <br /> Per Part 1.1.1 of the permit, the permittee must collect a stormwater sample from each outfall (or a <br /> substantially identical outfall pursuant to Part I.H.1 of the permit) and conduct a visual assessment <br /> of each of these samples once each quarter for the entire permit term. <br /> B. WQBEL/Water Quality Standards monitoring, Part 1.1.3 and 4 <br /> Discharges authorized under this permit must be controlled as necessary to meet applicable water <br /> quality standards. <br /> Stormwater Reporting Requirements <br /> ICIS Description Due date Frequency <br /> Code <br /> The permittee shall submit an annual report to the <br /> 00308 division for the reporting period January 1 through February 28 Annual (10) <br /> December 31. <br /> Page 2 of 3 <br /> 4300 Cherry Creek Drive S.,Denver,CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wgcd <br />