Laserfiche WebLink
Geotechnical Stability Exhibit ��� <br /> Engineering Evaluation of Highwall Design for the South Quarry of the Morrison Quarry <br /> Contents <br /> 1 Introduction ........................................................................................................................3 <br /> 1.1 Purpose and Scope...................................................................................................3 <br /> 1.2 Site Description .........................................................................................................3 <br /> 2 Geologic Conditions ...........................................................................................................6 <br /> 2.1 General Geology.......................................................................................................6 <br /> 2.2 Morrison Quarry Geology ..........................................................................................7 <br /> 2.3 Rock Types ...............................................................................................................7 <br /> 3 Field Evaluations................................................................................................................8 <br /> 3.1 Annual Quarry Inspections ........................................................................................8 <br /> 3.2 2022 Geotechnical Borings........................................................................................8 <br /> 3.2.1 Geophysical Evaluations................................................................................9 <br /> 4 Laboratory Testing ...........................................................................................................10 <br /> 4.1 Previous Testing......................................................................................................10 <br /> 4.1.1 Historic Strength Testing..............................................................................10 <br /> 4.2 Recent Testing ........................................................................................................12 <br /> 4.2.1 Recent Strength Testing ..............................................................................12 <br /> 4.2.2 Aggregate Property Testing .........................................................................15 <br /> 4.2.3 Petrographic Analysis ..................................................................................16 <br /> 5 Design Methodology.........................................................................................................18 <br /> 5.1 3-D Geologic Model.................................................................................................18 <br /> 5.2 Bench Stability.........................................................................................................18 <br /> 5.2.1 Hoek-Brown Parameters..............................................................................18 <br /> 5.2.2 Kinematic Analyses......................................................................................24 <br /> 5.2.3 Slope Stability Analyses...............................................................................26 <br /> 6 Quarry Geometry Recommendations ...............................................................................29 <br /> 6.1 Kinematic Stability Results ......................................................................................29 <br /> 6.2 Slope Stability Results.............................................................................................29 <br /> 7 Limitations........................................................................................................................30 <br /> 8 References.......................................................................................................................31 <br /> Figures <br /> Figure 1: Project location of the Morrison Quarry .......................................................................4 <br /> Figure 2: Approximate extents of mining cells within Morrison Quarry........................................4 <br /> Figure 3: Geologic map of project area ......................................................................................7 <br /> Figure 4: Suggested Value of D based on excavation method (Hoek, 2000)............................20 <br /> May 2023 1 i <br />