My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:10:01 AM
Creation date
11/1/2023 6:55:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment A - Rule 6.5 Geotech Stability Exhibit - Intro and Table of Contents
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Stability Exhibit <br /> Engineering Evaluation of Highwall Design for the South Quarry of the Morrison Quarry <br /> Recent Testing <br /> HDR contracted with Advanced Terra Testing, Inc., of Lakewood, CO, to perform rock strength <br /> and aggregate testing for the project, and DRP, Inc. of Boulder, CO to perform petrographic <br /> analyses. Refer to the sections below for a summary of the performed testing and refer to <br /> Appendix A, Subsurface Exploration Findings, for the results. <br /> 4.2.1 Recent Strength Testing <br /> A total of 28 UCS tests including the elastic modulus were performed in accordance with ASTM <br /> D7012-14, Method D. Testing was performed on varying lithologies in order to develop an <br /> understanding the of the rock strength to be utilized in design. Refer to Table 4 below for a <br /> summary of the testing results. <br /> May 2023 1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.