My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-30_HYDROLOGY - M2001085 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2023-10-30_HYDROLOGY - M2001085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 9:03:47 AM
Creation date
10/31/2023 7:51:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
10/30/2023
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Aurora does not allow the use of, and LLC-85 will not use,the Reusable Raw <br /> Water by direct use, augmentation, replacement,or exchange within or upstream of a decreed <br /> instream flow reach if such use will deprive-the decreed-instream flow of water it is entitled to by <br /> priority unless waived by the Colorado Water Conservation Board ("CVVCB")consistent with <br /> the CWCB Board procedures and law allowing such action. Any such use will be deemed a <br /> violation of the terms of this Agreement. <br /> 6. Water Rights Accounting. 120-85 will be solely responsible for any and all reporting and <br /> accounting required by the Colorado State Engineer, the Division Engineer for Water Division 1, <br /> the Water Commissioner for Water District 2, or any other lawful authority after Aurora-makes its <br /> delivery of the Reusable Raw Water as provided for under this Agreement. This responsibility <br /> includes, but is not limited to, 120-85's withdrawal of the Reusable Raw Water from the South <br /> Platte River (if any) and 120-85's use of the Reusable Raw Water. In addition to the reporting <br /> requirements set forth in Paragraph 3, above, Aurora will provide any and all reporting and <br /> accounting required by the Colorado State Engineer, the Division 1 Engineer, or any other lawful <br /> authority concerning proof of the reusability of the Reusable Raw Water, and conveyance of the <br /> Reusable Raw Water to the Delivery Points. <br /> 7. Subordination Clause. This Agreement shall be made expressly subordinate to any present <br /> or future use of Reusable Raw Water by Aurora for the purposes of augmentation, exchange, or <br /> any other use which is or will be of greater direct benefit to Aurora and the users of its water <br /> delivery system, as well as to the water supply obligations which Aurora has incurred or will incur <br /> from any firm delivery annual agreement or delivery contract of Reusable Raw Water executed <br /> prior to the date of this Agreement or that Aurora determines,in its sole discretion,this Agreement <br /> is to subordinate to. The foregoing subordination does not, in and of itself, create an excuse for <br /> Aurora's failure to deliver the Reusable Raw Water under this Agreement. However,the Parties <br /> agree that the purpose and obligations under this Agreement and Aurora's other obligations with <br /> respect to its Reusable Raw Water in the event of a force majeure event may cause delay or <br /> interruption in Aurora's delivery of the Reusable Raw Water. As used herein force majeure shall <br /> mean any delay or failure of a Party to perform its obligations under this Agreement caused by <br /> events beyond the Party's reasonable control, and without the fault or negligence of the Party. <br /> 8. Consideration. 120-85 agrees to pay to Aurora the amount of Five Hundred Fifty Dollars <br /> ($550.00)per acre-foot("Unit Rate")for all Reusable Raw Water delivered under this Agreement. <br /> If this Agreement is continued for Additional Years, the Unit Rate shall escalate annually by the <br /> same percentage increase as the overall average revenue increase in Aurora's potable rates. <br /> 9. Payment. Immediately after the Effective Date, as defined in Paragraph 18(m), below, <br /> Aurora shall bill for all Reusable Raw Water delivered to 120-85 for the Term, and will bill <br /> annually for any Additional Year(s). All billing shall be done on such forms as designated by <br /> Aurora for that purpose. Payment by 120-85 shall be due no later than forty-five(45) days after <br /> such bill has been issued. If 120-85 does not make the required payment by the due date, Aurora <br /> may give 120-85 a notice of default. If 120-85 does not cure the default by making full payment <br /> within thirty (30)days of receipt of any notice of default,then Aurora, in addition to pursuing any <br /> other remedies available to it, may declare this Agreement terminated. Any delay in Aurora's <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.