Laserfiche WebLink
Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.100 (50%SL) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4772 <br /> Adjusted unit 595.02 LCY/hr <br /> production: <br /> Adjusted fleet 595.02 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.741/LCY <br /> Total job time: 6.12 Hours <br /> Total job cost: S2,696 <br />