Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 11 of 11 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: TRINIDAD <br /> Total one-way travel distance: 8.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $10,599.08 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $75.69 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.15 0.15 <br /> Return Time(Hours): 0.15 0.15 <br /> Loading Time(Hours): 1.00 NA <br /> Unloading Time(Hours): 1.00 NA <br /> Subtotals: 2.29 0.29 <br /> JOB TIME AND COST <br /> Total job time: 4.58 Hours <br /> Totaljob cost: $10,675 <br /> CIRCES Cost Estimating Software <br />