My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-23_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
2023-10-23_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 9:29:39 AM
Creation date
10/23/2023 10:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
10/23/2023
Doc Name
Incompleteness Notice
From
DRMS
To
American Soda LLC
Type & Sequence
SO2
Email Name
ACY
THM
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Celina Akin <br /> Page 2 of 3 <br /> 10/23/2023 <br /> Legal Right of Enter <br /> 6. Provide a description of the basis for legal right of entry to the site and to conduct <br /> mining and reclamation. See Rules 1.6.2(1)(e)(i), 1.1.12.1(2) and 6.4.14.This may be a <br /> copy of an access lease, deed, abstract of title, current tax receipt, or a signed and <br /> notarized statement by the property owners stating that the Prospective Successor <br /> has a legal right to enter to conduct mining and reclamation. <br /> Structure Agreement <br /> 7. No Structure Agreements (damage compensation waivers) were provide. Please <br /> include Structure Agreement(s) or an engineering evaluation (Geo-tech Rule 6.5) for all <br /> permanent man-made structures located within 200 ft. of the affected lands pursuant <br /> to Rule 1.12.1(2) and 6.4.19. <br /> Financial Warranty <br /> 8. The total bond held between the Division and the BLM is$7,444,531.00.The Division's <br /> portion is 5% of the total bond. The Division currently requires a financial warranty <br /> amount of$236,424 for this site. The BLM holds the remaining bond amount. <br /> a. An original Financial Warranty form signed by Todd Brichacek and <br /> notarized. In addition, a bond in the amount of $236,424.00 is required. If <br /> America Soda LLC is owned by the same company as Solvay Chemicals, Inc. a <br /> name change rider to the existing Safeco surety changing the name to <br /> American Soda LLC is acceptable. <br /> b. Provide documentation that the BLM's portion of the Financial Warranty has <br /> also been replaced/updated. <br /> Please return the required documentation to the Division before Tuesday, December 26, 2023. <br /> All completed permit documents are required to be submitted for consideration of your Request <br /> for Transfer of Mineral Permit and Succession of Operators Application. An incomplete <br /> application may be denied after the 60-day submittal request, if requested documents or <br /> information are not received. In the event of any delay in your submittal or if you have any <br /> questions, please contact the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.