Laserfiche WebLink
Push gradient: 1.329 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.8865 <br /> Adjusted unit production: 1,105.38 LCY/hr <br /> Adjusted fleet production: 2210.76 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.385/LCY <br /> Total job time: 7.92 Hours <br /> Total job cost: $6,734 <br />