My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-16_REVISION - M1985218
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985218
>
2023-10-16_REVISION - M1985218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 8:04:10 AM
Creation date
10/16/2023 8:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985218
IBM Index Class Name
Revision
Doc Date
10/16/2023
Doc Name Note
& Cost Estimate Enclosed
Doc Name
Notice of Surety Increase
From
DRMS
To
Phillip Courtney
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> Task description: Spread Topsoil over 84.19 acres <br /> Site: Rich Pit Permit Action: 2023 Inspection Permit/Job#: M1985218 <br /> PROJECT IDENTIFICATION <br /> Task#: 007A State: Colorado Abbreviation: None <br /> Date: 8/31/2023 County: Pueblo Filename: M218-007A <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 657G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 50 50 50 50 <br /> Ownership cost/hour: $379.25 NA $241.38 $241.38 $74.98 $11.35 <br /> Operating cost/hour: $358.77 NA $71.96 $71.96 $27.63 $11.46 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $47.28 NA $40.04 $40.04 $46.87 $0.00 <br /> Unit Subtotals: $785.30 NA $353.38 $353.38 $149.48 $22.81 <br /> Number of Units: 4 0 1 1 1 1 <br /> Group Subtotals: Work: $3,141.20 Support: $706.76 Maine $172.29 <br /> Total work team cost/hour: $4,020.25 <br /> MATERIAL QUANTITIES <br /> Initial volume: 67,913 CCY Swell factor: 1.000 <br /> Loose volume: 67,913 LCY <br /> Source of estimated volume: Google Earth dist acreage est from 2023 image and.5' TS <br /> AM 1 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 32.00 LCY <br /> Material description: Top Soil Heaped Volume: 44.00 LCY <br /> Rated Payload: 104,000 pounds Average Volume: 38.00 LCY <br /> Payload Capacity: 65.00 LCY Adjusted Capacity: 38.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.