Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 6 of I <br /> SCRAPER TEAM WORK <br /> Task description: Replace Subsoil and Topsoil <br /> Site: State Pit Permit Action: 2023 Inspection Permit/Job#: M1990112 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 8/3/2023 County: Pueblo Filename: 003 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 657G <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D7R DS XR Series II <br /> -Dump Area: Cat D7R DS XR Series II <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 50 50 100 50 <br /> Ownership cost/hour: $390.03 NA $114.76 $114.76 $149.33 $11.35 <br /> Operating cost/hour: $361.96 NA $45.99 $45.99 $92.79 $11.46 <br /> %Utilization-ripper: NA NA 0 0 0 NA <br /> Ripper own. cost/hour: NA NA $9.06 $9.06 $5.83 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $47.28 NA $40.04 $40.04 $46.87 $0.00 <br /> Unit Subtotals: $799.27 NA $209.85 $209.85 $294.82 $22.81 <br /> Number of Units: 8 0 1 1 1 1 <br /> Group Subtotals: Work: $6,394.16 Support: $419.70 Maine $317.63 <br /> Total work team cost/hour: $7,131.49 <br /> MATERIAL QUANTITIES <br /> Initial volume: 242,000 CCY Swell factor: 1.000 <br /> Loose volume: 242,000 LCY <br /> Source of estimated volume: Application: 6" subsoil.--6"topsoil. 150 acres <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY Struck Volume: 32.00 LCY <br /> CIRCES Cost Estimating Software <br />