My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-16_REVISION - M1990112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990112
>
2023-10-16_REVISION - M1990112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 10:02:46 AM
Creation date
10/16/2023 8:37:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990112
IBM Index Class Name
Revision
Doc Date
10/16/2023
Doc Name Note
& Cost Estimate Enclosed
Doc Name
Notice of Surety Increase
From
Jodi Schreiber - Fremont Paving & Redi -Mix, Inc.
To
DRMS
Type & Sequence
SI2
Email Name
AMG
JLE
SMS
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#000 Page 3 of 11 <br /> Material weight: 2,6501bs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.601 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.7007 <br /> Adjusted unit 598.47 LCY/hr <br /> production: <br /> Adjusted fleet 1196.94 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.432/LCY <br /> Total job time: 16.32 Hours <br /> Total job cost: $8,431 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.