My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-10_REVISION - M2009077
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009077
>
2023-10-10_REVISION - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 8:30:31 PM
Creation date
10/11/2023 8:01:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
Revision
Doc Date
10/10/2023
Doc Name
Request for Technical Revision
From
RPM, Inc
To
DRMS
Type & Sequence
TR1
Email Name
JR2
AME
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPM,Inc. <br /> COLORADO DIVISION OF REC'LANIATIO-N-, '\11'-\I.N-GA'-\'D SAFETY <br /> Sh,-imnr.St-et.Room 21-1.Denvei.Colorado SON3 A(303)S66 <br /> REQUEST FOR TEC EL\I(-Al REVISION (TR)COVER SHEET <br /> FileNo.:N1- 2009-077 site,,ulle:Dill Pit <br /> County Elbert TRH 0,1115 Use onh) TR-1 <br /> JR2/AME <br /> Permittee:Tracy and Ed Grimes, dba Yucca Ridge Sand and Gravel <br /> Operator(If Other than Permittee):NA <br /> Pernlittee Represewative.Regulatory Permits Management, Inc. <br /> Please provide a brief description of the proposed fcntsion: <br /> Revise the approved see mix <br /> As defined by the Nfinerals Rules.a Technical Revision JR)is:--a change in the permit or application <br /> Which does not have more than a mmor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition- If the Division determines that the proposed revision is beyond the scope of a TR- <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered'filed for review-until the appropriate fee is received by the <br /> Division(as listed below by permit type).. Please submit the appropriate fee with your request to <br /> expedite the review process- After the TR is submitted with the appropriate fee-the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR-you will be notified of specific deficiencies that u-ill need to be addressed- If at the end of the 30 <br /> day review period there are still outstanding deficiencies.the Division must deny the TR unless the <br /> permittee requests additional time.in writing.to provide the required information. <br /> There is no pre-defined format for the submittal of a TR-however.it is up to the pefnuttee to provide <br /> sufficient information to the Division to approve the TR request_including,updated mining and <br /> reclamation plan nips that accurately depict the changes proposed in the requested TF, <br /> Required Fees for Technical Revision by Permit T}pe-Please=k-the correct fee and submit it with <br /> your request for a Technical Revision- <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 1 loc.111. 1121 construction <br /> materials.and 112 quarries S216 M( <br /> 112 hard rock-(not DNIO) S175 <br /> I 10d, 11 2d(l.2 or 3) $1006 <br /> RPM,Inc., 25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2Cacomcast.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.