Laserfiche WebLink
and remains in effect,the permittee shall either submit to the Division the following <br /> information, current to the date the cessation order was issued, or notify the <br /> Division in writing that there has been no change since the immediately preceding <br /> submittal of such information: <br /> a. Any new information needed to correct or update the information previously <br /> submitted to the Division by the permittee under 2.03.4(3); or <br /> b. If not previously submitted, the information required from a permit applicant <br /> by 2.03.4(3). <br /> 7. The permittee shall conduct surface coal mining and reclamation operations only on <br /> those lands that are specifically designated as the permit area on the maps and in the <br /> legal description submitted with the application. Areas disturbed and affected by <br /> surface coal mining and reclamation operations shall be contained within the <br /> boundaries authorized on permit application maps for the term of this permit and <br /> shall be limited to those areas subject to the performance bond in effect pursuant to <br /> these rules. <br /> 8. The permittee shall conduct all surface coal mining and reclamation operations only <br /> as described in the approved application, except as otherwise directed by the <br /> Division in this permit. <br /> 9. The permittee shall comply with the terms and conditions of this permit, all <br /> applicable performance standards of the Act, and the requirements of these Rules. <br /> 10. Continuous, uninterrupted bond coverage shall be in effect at all times, and an <br /> adequate bond amount shall be maintained pursuant to the requirements of Rule <br /> 3.02.2. Operating without a bond is a violation of a condition upon which this <br /> permit is issued. <br /> 11. If analyses of the mining and reclamation operation and the data collected through <br /> monitoring and experimentation by the operator or monitoring by the Division <br /> indicate in the judgment of the Division that the operation will not be able to <br /> comply with the requirements of the Act and lawful rules and regulations <br /> thereunder, operator hereby agrees to exercise its best efforts, after consulting with <br /> the Division, to modify the plans prospectively to correct such deficiencies. Such <br /> modifications may require technical revisions or amendments to the permit. <br /> 12. This permit may be revoked or suspended for non-compliance with the Act or <br /> lawful rules or regulations promulgated by the Board. <br /> 13. No coal mining operations shall be conducted on Federal surface or coal until the <br /> Secretary of the Interior has approved the mining plan. The Division reserves the <br /> right to modify the permit, when appropriate, in order to resolve conflicts between <br /> Page 6 of 9 <br />