My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 11:00:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.6 Red Creek Quarry Modelint
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
MAC
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Red Creek Quarry, Groundwater Modeling Analysis <br /> <br /> <br /> <br />13 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. <br />RedCreekQuarry_Modeling_TM_DRAFT_20230911 <br />Table 2. Red Creek Quarry Mine Block Groundwater Rates Model Results <br />Mine Block Rate of Groundwater Entering Mine Block <br />(ft3/day) (gpm) (acre-feet/year) <br />0 to 10 440.75 2.29 3.69 <br />0 to 10 deep sandstone 1326.69 6.89 11.12 <br />10 to 20 0 0 0 <br />10 to 20 deep sandstone 3134.09 16.28 26.26 <br />20 to 30 8742.07 45.41 73.25 <br />30 to 40 0 0 0 <br />40 to 50 0 0 0 <br />50 to 60 0 0 0 <br />60 to 70 0 0 0 <br />70 to 80 0 0 0 <br />80 to 90 0 0 0 <br />90 to 100 0 0 0 <br />3.3 Projected MPO Mine Block Creek Influence <br />To evaluate the potential impact of each mine block on Red Creek, the rate of groundwater in for each Red <br />Creek reach during every mine block was compared to the EC model results. Table 3 illustrates the compari- <br />son between every mine block and each Red Creek reach with the EC model results. Projected flow rates are <br />for comparison purposes only. <br />There were no reaches in Red Creek that became dry during the MPO. There was also no significant de- <br />crease in any of the Red Creek reaches at any point during the MPO. These comparisons suggest that the <br />mine blocks will not influence Red Creek. <br />Table 3. Red Creek Quarry Mine Block Influence on Red Creek Model Results <br />Stream <br />Reach 1 2 3 4 5 6 7 8 9 10 11 <br />Mine Block Rate of Groundwater Entering Stream (ft3/day) <br />Existing <br />Conditions 1854 646 66 51 230 136 47 9 0 0 0 <br />0 to 10 1852 640 64 50 229 136 47 8 0 0 0 <br />10 to 20 1851 640 64 49 229 135 47 8 0 0 0 <br />20 to 30 1851 640 64 49 229 136 47 8 0 0 0 <br />30 to 40 1852 640 64 49 229 136 47 8 0 0 0 <br />40 to 50 1851 640 64 49 229 135 46 9 0 0 0 <br />50 to 60 1852 640 64 49 229 135 46 8 0 0 0 <br />60 to 70 1851 640 64 48 229 135 46 9 0 0 0 <br />70 to 80 1852 640 64 49 228 134 46 9 0 0 0
The URL can be used to link to this page
Your browser does not support the video tag.