Laserfiche WebLink
Technical Memorandum <br /> <br />Limitations: <br />This is a draft memorandum and is not intended to be a final representation of the work done or recommendations made by Brown and Caldwell. It <br />should not be relied upon; consult the final report. <br />This document was prepared solely for Holcim (US), Inc. in accordance with professional standards at the time the services were performed and in <br />accordance with the contract between Holcim (US), Inc. and Brown and Caldwell dated February 19, 2023 This document is governed by the specific <br />scope of work authorized by Holcim (US), Inc.; it is not intended to be relied upon by any other party except for regulatory authorities contemplated by <br />the scope of work. We have relied on information or instructions provided by City of Pleasanton and other parties and, unless otherwise expressly <br />indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information . <br />1527 Cole Blvd, Suite 300, <br />Lakewood, CO 80401 <br /> <br />T: 303.239.5400 <br /> <br /> <br />Prepared for: Holcim (US), Inc. <br />Project Title: Red Creek Quarry <br />Project No.: 159224-005-002 <br />Technical Memorandum <br />Subject: Red Creek Quarry, Groundwater Modeling Analysis <br />Date: September 22, 2023 <br />To: Michael Toelle, Holcim (US), Inc. <br />From: Brown and Caldwell <br />Copy to: Julio Villon, Holcim (US), Inc <br /> <br /> <br />Prepared by: <br />Rebecca Anderson, Staff Hydrogeologist, GIT <br /> <br />Reviewed by: <br />Stacia Prazen, Principal Hydrogeologist, PG, CHG <br />