My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (22)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:41:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.5 Red Creek Quarry Baseline Water Information
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1795
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Red Creek Quarry Baseline Water Investigation Table of Contents <br /> <br /> <br />vi <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this docu ment. <br />Red Creek Quarry Baseline Water Information 20230907 <br />List of Abbreviations <br />BC Brown and Caldwell <br />bgs below ground surface <br />cfs cubic feet per second <br />cm/H20 centimeters of water <br />DO dissolved oxygen <br />EC existing conditions <br />EPA United States Environmental Protection Agency <br />DRMS Division of Reclamation, Mining, & Safety <br />gpd gallons per day <br />gph gallons per hours <br />Holcim Holcim (US), Inc. <br />LCSs laboratory control samples <br />LCSDs laboratory control sample duplicates <br />L Liter <br />meq/L milliequivalents per Liter <br />%meq/L percent milliequivalents per Liter <br />MPO mine plan operations <br />MSs matrix spikes <br />MSDs matrix spike duplicates <br />ORP oxidation reduction potential <br />PCBs polychlorinated biphenyls <br />PVC polyvinylchloride <br />QA/QC quality assurance/quality control <br />QAPP Quality Assurance Project Plan <br />RCQ Red Creek Quarry <br />RPD relative percent difference <br />SAP Sampling and Analysis Plan <br />SC specific conductance <br />SOPs standard operating procedures <br />TDS total dissolved solids <br />TSS total dissolved solids <br />TOC top of casing <br />USACE United States Army Corps of Engineers <br />USGS United States Geological Survey <br />WQCC Water Quality Control Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.