Red Creek Quarry Baseline Water Investigation Section 7 <br /> <br /> <br />7-2 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this docu ment. <br />during the first quarterly sampling event (3Q 2022). No photograph was taken at visual <br />observation location 012 during the third quarterly sampling event (1Q 2023). <br />• The upstream surface water sample SW RC1 was collected from the Stilling Well during the first <br />quarterly sampling event (3Q 2022). <br />• During the first quarterly sampling event (3Q 2022), the surface water duplicate was split <br />between SW RC1 (Stilling Well) and SW Seep with most of the duplicate sample collected from <br />the seep location. <br />• During the first quarterly sampling event (3Q 2022), the groundwater field duplicate sample was <br />split between two wells (Well 1 and Well 3). <br />• The full suite of field parameters was inadvertently not recorded from the surface water sites for <br />the first sampling event (3Q 2022). <br />• During the first sampling event (3Q 2022) parameters total alkalinity and TDS were inadvertently <br />collected from Well 4 on three separated dates (8/11/2022, 8/12/2022, and 9/6/2022) and <br />SW RC2 on two separate dates (8/31/2022 and 9/6/2022). <br />• Depth to water measurements were inadvertently not recorded from Well 2N for the first <br />sampling event (3Q 2022). <br />• The hexavalent chromium analyses have a 24-hour hold time. Several samples were not <br />analyzed within the hold time and were qualified during the first four quarterly sampling events. <br />• Sample coolers were submitted above temperature for the fifth quarterly sampling event (3Q <br />2023). The radio chemical and oil & grease results for the groundwater samples were qualified <br />due to sample temperature. <br />7.3 Recommendations for Continued Monitoring <br />It is recommended that monitoring continue on a reduced scale until mine development <br />commences. The interim monitoring program is based on review of the baseline water quality <br />statistics in Appendix H and the hydrogeology of the site. <br />Interim monitoring should be conducted on the Site annually during the third calendar quarter. <br />Groundwater quality samples should be collected from Well 1 and Well 3 to continue monitor <br />groundwater quality upgradient and downgradient of the Red Creek seep. Surface water quality <br />samples should be collected from the SW SEEP and SW RC2 surface water locations to monitor <br />surface water quality from the seep where groundwater is discharging to the surface and the furthest <br />downstream location to monitor the water quality within the Red Creek drainage. The analyte list for <br />the interim monitoring program contains inorganic, dissolved metals, and radiological constituents <br />with naturally occurring elevated concentrations (Table 7-1). Constituents that were below the <br />detection limit for all five quarters of baseline data, had no applicable water quality standard or were <br />detected at an order of magnitude or more below the water quality standard concentration have <br />been eliminated from the interim monitoring analyte list. <br />It is also recommended that groundwater level data be continue using the installed pressure <br />transducers during the interim monitoring program. Red Creek flow data is to be collected at the <br />flume using the installed pressure transducer. The frequency at which the transducer data is <br />downloaded and reviewed should be quarterly. <br />