Laserfiche WebLink
Quality Assurance Project Plan <br />Red Creek Quarry Monitoring Program Section 11: Data Validation and Usability <br /> <br /> <br />11-2 <br /> <br />QC results, assessing whether DQOs have been achieved, and flagging data that did not meet <br />specific requirements. Data qualifiers will be added to the database to alert data users of data <br />limitations and uncertainties. A data quality assessment will be completed to summarize the results <br />of the review and validation. <br />If corrective action is necessary based on the data verification/validation process, the QAO will be <br />responsible for communicating the nonconformance and the corresponding corrective actions to the <br />laboratory, the PM, or other designee. A data quality assessment section summarizing qualified <br />results and including any corrective actions will be included in the summary reports. <br />11.3 Reconciliation with User Requirements <br />To fulfill the identified data needs, it is important that the data collected for the project meet the <br />DQOs. If data do not meet the project specifications, the results will be flagged in the database to <br />alert the data user of the data limitations and the following actions will be taken. First, the QAO and <br />PM or other designee will review the errors and determine if the problem is equipment failure, <br />calibration/maintenance techniques, or monitoring/sampling techniques. The QAO, PM, or designee <br />will suggest corrective action. <br />If the problem cannot be corrected by training, revision of techniques, or replacement of <br />supplies/equipment, then the technical advisor will review the DQOs and determine if the DQOs are <br />feasible. If the specific DQOs are not achievable, they will determine whether the specific DQO can <br />be relaxed or if the parameter should be eliminated from the monitoring program. Any revisions to <br />DQOs will be reviewed by the project team prior to approval and QAPP revision. <br />The database will continue to be maintained for 5 years after the completion of the Project. <br /> <br />