My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.4 Holcim RCQ SAP
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance Project Plan <br />Red Creek Quarry Monitoring Program Section 11: Data Validation and Usability <br /> <br /> <br />11-2 <br /> <br />QC results, assessing whether DQOs have been achieved, and flagging data that did not meet <br />specific requirements. Data qualifiers will be added to the database to alert data users of data <br />limitations and uncertainties. A data quality assessment will be completed to summarize the results <br />of the review and validation. <br />If corrective action is necessary based on the data verification/validation process, the QAO will be <br />responsible for communicating the nonconformance and the corresponding corrective actions to the <br />laboratory, the PM, or other designee. A data quality assessment section summarizing qualified <br />results and including any corrective actions will be included in the summary reports. <br />11.3 Reconciliation with User Requirements <br />To fulfill the identified data needs, it is important that the data collected for the project meet the <br />DQOs. If data do not meet the project specifications, the results will be flagged in the database to <br />alert the data user of the data limitations and the following actions will be taken. First, the QAO and <br />PM or other designee will review the errors and determine if the problem is equipment failure, <br />calibration/maintenance techniques, or monitoring/sampling techniques. The QAO, PM, or designee <br />will suggest corrective action. <br />If the problem cannot be corrected by training, revision of techniques, or replacement of <br />supplies/equipment, then the technical advisor will review the DQOs and determine if the DQOs are <br />feasible. If the specific DQOs are not achievable, they will determine whether the specific DQO can <br />be relaxed or if the parameter should be eliminated from the monitoring program. Any revisions to <br />DQOs will be reviewed by the project team prior to approval and QAPP revision. <br />The database will continue to be maintained for 5 years after the completion of the Project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.